The present study compares the progressive collapse approach with the traditional temperature screening method on determination of PFP requirements at topside offshore structures. The advantage to evaluate the consequences of fire scenarios on the global integrity and stability of topside modules can be revealed by a substantial reduction of the required amount of PFP, and consequently significant cost savings for operators, when compared to the traditional approach. In the case study presented in this paper, there is a reduction of 79% in PFP allocation.