As one aspect of flow assurance considerations, severe slugging control strategy in deepwater riser is related to the safety of production system, therefore it’s of great significance to the development of deepwater oil and gas field. This paper summarizes commonly used severe slugging control methods briefly, then takes certain deepwater oil and gas field as an example to introduce the method of software simulation for making severe slugging control strategy of deepwater riser. Firstly the model is built with basic information such as pipeline route, production profile and fluid composition. Data of typical years is used to simulate flowing conditions to determine whether it’s within slugging zone. To mitigate slugging conditions, choking, gas lift and choking& gas lift combined methods are chosen and simulated based on the oil and gas field characteristics, and according to the results gas lift is suggested as the best solution. Factors such as riser type, gas injection location, and flexible riser depth are analyzed for better gas lift efficiency. Finally hydrate formation risk related to severe slugging is analyzed and the slug catcher size is checked. Based on the introduced software simulation procedure, severe slugging control strategy is made, which will be valuable for deepwater flow assurance design and study.
Skip Nav Destination
ASME 2014 33rd International Conference on Ocean, Offshore and Arctic Engineering
June 8–13, 2014
San Francisco, California, USA
Conference Sponsors:
- Ocean, Offshore and Arctic Engineering Division
ISBN:
978-0-7918-4545-5
PROCEEDINGS PAPER
Software Simulation for Making Severe Slugging Control Strategy in Deepwater Riser
Bing Cheng,
Bing Cheng
CNOOC Research Institute, Beijing, China
Search for other works by this author on:
Qingping Li,
Qingping Li
CNOOC Research Institute, Beijing, China
Search for other works by this author on:
Xichong Yu,
Xichong Yu
CNOOC Research Institute, Beijing, China
Search for other works by this author on:
Haiyuan Yao
Haiyuan Yao
CNOOC Research Institute, Beijing, China
Search for other works by this author on:
Bing Cheng
CNOOC Research Institute, Beijing, China
Qingping Li
CNOOC Research Institute, Beijing, China
Xichong Yu
CNOOC Research Institute, Beijing, China
Haiyuan Yao
CNOOC Research Institute, Beijing, China
Paper No:
OMAE2014-23031, V005T11A001; 5 pages
Published Online:
October 1, 2014
Citation
Cheng, B, Li, Q, Yu, X, & Yao, H. "Software Simulation for Making Severe Slugging Control Strategy in Deepwater Riser." Proceedings of the ASME 2014 33rd International Conference on Ocean, Offshore and Arctic Engineering. Volume 5: Materials Technology; Petroleum Technology. San Francisco, California, USA. June 8–13, 2014. V005T11A001. ASME. https://doi.org/10.1115/OMAE2014-23031
Download citation file:
17
Views
Related Proceedings Papers
Related Articles
The Stability of Fluid Production From a Flexible Riser
J. Energy Resour. Technol (June,2002)
Fluids Transport Optimization Using Seabed Separation
J. Energy Resour. Technol (September,2000)
Development of an Analytical Tool for the Design of Deep Water Riser/Flow Line Thermal Insulation Systems
J. Offshore Mech. Arct. Eng (May,2005)
Related Chapters
QRAS Approach to Phased Mission Analysis (PSAM-0444)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)
Introduction to Pipeline Systems
Pipeline Pumping and Compression Systems: A Practical Approach
A Rapid Tool for Risk-Based Post-Cyclonic Integrity Assessment of Flexible Risers
Asset Integrity Management of Critical Infrastructure