For pipe lay operations parameters like heading and position of the lay vessel are available from the GPS system on the vessel. In some cases the current profile may also be monitored. Provided that a fast and robust numerical tool is available and can be integrated with the on-board system, the above parameters and a measure of tension in the pipe will be sufficient to simulate the appurtenant static configuration of the catenary and visualize it online during the lay operation. Such a system will provide valuable additional information such as: catenary shape including stresses in the pipe, lay tension, development of free spans, and lateral stability during installation. In the period April-August 2009 two field tests of the developed system were performed. Both field tests were related to Acergy installation campaigns for the Ormen Lange Phase II development in the North Sea; 1) ∼13 km infield MEG (IMEGDA) installation by Acergy Falcon, and 2) ∼13km infield umbilical (IUMB-DA) installation by Acergy Eagle (both at ∼860m water depth). In this paper the experiences from the field tests are discussed. This includes assessment of on-board data collection and storage of key parameters during installation, real-time online 3D finite element (FE) analysis and satellite link to shore for support during installation. The accuracy of the results obtained in the on-board monitoring system is assessed by comparison to available as-laid survey information.
Skip Nav Destination
ASME 2011 30th International Conference on Ocean, Offshore and Arctic Engineering
June 19–24, 2011
Rotterdam, The Netherlands
Conference Sponsors:
- Ocean, Offshore and Arctic Engineering Division
ISBN:
978-0-7918-4436-6
PROCEEDINGS PAPER
On-Board Monitoring, Analysis and Decision Support During Offshore Pipe Lay Operation
Ole David O̸kland,
Ole David O̸kland
Marintek, Trondheim, Norway
Search for other works by this author on:
Ole Magnus Holden
Ole Magnus Holden
Statoil ASA, Stavanger, Norway
Search for other works by this author on:
Joakim Taby
Marintek, Trondheim, Norway
Ole David O̸kland
Marintek, Trondheim, Norway
Egil Giertsen
Marintek, Trondheim, Norway
Naiquan Ye
Marintek, Trondheim, Norway
Melvyn Morgan
Subsea 7, Aberdeen, UK
Ole Magnus Holden
Statoil ASA, Stavanger, Norway
Paper No:
OMAE2011-49386, pp. 335-341; 7 pages
Published Online:
October 31, 2011
Citation
Taby, J, O̸kland, OD, Giertsen, E, Ye, N, Morgan, M, & Holden, OM. "On-Board Monitoring, Analysis and Decision Support During Offshore Pipe Lay Operation." Proceedings of the ASME 2011 30th International Conference on Ocean, Offshore and Arctic Engineering. Volume 4: Pipeline and Riser Technology. Rotterdam, The Netherlands. June 19–24, 2011. pp. 335-341. ASME. https://doi.org/10.1115/OMAE2011-49386
Download citation file:
12
Views
Related Articles
Characterizing the Wave Environment in the Fatigue Analysis of Flexible Risers
J. Offshore Mech. Arct. Eng (May,2006)
Underwater Wet Repair Welding and Strength Testing on Pipe-Patch Joints
J. Offshore Mech. Arct. Eng (November,1998)
Drop Formation in Non-Newtonian Jets at Low Reynolds Numbers
J. Fluids Eng (August,2008)
Related Chapters
Subsection NCA—General Requirements for Division 1 and Division 2
Companion Guide to the ASME Boiler & Pressure Vessel Code, Volume 1, Second Edition
Subsection NCA—General Requirements for Division 1 and Division 2
Companion Guide to the ASME Boiler and Pressure Vessel Code, Volume 1, Third Edition
Applications of Elastic-Plastic Fracture Mechanics in Section XI, ASME Code Evaluations
Online Companion Guide to the ASME Boiler & Pressure Vessel Codes