In the late 2006, as a part of its GoM HPHT technology program, BP initiated with V&M the design and qualification of a 15k dual barrier dry tree production riser system capable of being installed in water depths up to 10,000 ft. This was driven by the fact that X-80 riser systems became so heavy that they were not considered workable, whereas switching to higher strength steel and T&C connector designs made the systems much lighter and became enabling technologies for dry trees. Developments concern an 11 3/4″ OD with 1.1″ wall thickness C-110 sour service resistant material as the inner riser rated to 15k, a 16″ OD with 1″ wall thickness Q-125 material as the outer riser rated to 10k, and a 21″ OD with 1″ wall thickness Q-125 material as the drilling riser rated to 10k. The specification called for all three connections to be designed with an external environmental metal to metal seal, and superior fatigue performance. Based on existing know-how on fatigue resistant T&C connectors, the development work started with the 11 3/4″ inner riser, with a need to accommodate existing design rules for such a heavy pipe. A comprehensive evaluation program was built, with a total of 39 samples including 5 design variations, and full scale tests combining Make & Break, sealability, fatigue, and thermal cycles. The qualification was completed with a connector achieving over 25 M&B and a stress factor less than 1.5 compared to DNV-B1 curve, that is a stress factor matching DNV-C. With success on the 11 3/4″ and some lessons learned along the way, focus was then shifted to the 16″ outer riser. Key issues were identified here concerning the surface treatment quality of the metal to metal seals when combining large sliding distance and high contact pressure. The 21″ drilling riser development is on-going. As we near full product qualification, we focus on final optimizations to ensure easy field running. This paper will prove the robustness of the design process elaborated to develop heavy wall riser T&C premium connectors, leading to outstanding fatigue performance and fatigue compliant internal and external environmental metal to metal seals. Such results prove the applicability of T&C for dry tree HPHT systems, and further establish the potential of T&C to be used for SCR and Flowline applications.
Skip Nav Destination
ASME 2010 29th International Conference on Ocean, Offshore and Arctic Engineering
June 6–11, 2010
Shanghai, China
Conference Sponsors:
- Ocean, Offshore and Arctic Engineering Division
ISBN:
978-0-7918-4913-2
PROCEEDINGS PAPER
Design and Qualification of Fatigue Resistant Heavy Wall Threaded and Coupled Premium Connectors for Drilling and Production Riser Applications in Deepwater HPHT Dry Tree Systems
Ce´line Sches,
Ce´line Sches
V&M Tubes, Aulnoye-Aymeries, France
Search for other works by this author on:
Roy Shilling
Roy Shilling
BP America, Houston, TX
Search for other works by this author on:
Ce´line Sches
V&M Tubes, Aulnoye-Aymeries, France
Roy Shilling
BP America, Houston, TX
Paper No:
OMAE2010-20904, pp. 923-931; 9 pages
Published Online:
December 22, 2010
Citation
Sches, C, & Shilling, R. "Design and Qualification of Fatigue Resistant Heavy Wall Threaded and Coupled Premium Connectors for Drilling and Production Riser Applications in Deepwater HPHT Dry Tree Systems." Proceedings of the ASME 2010 29th International Conference on Ocean, Offshore and Arctic Engineering. 29th International Conference on Ocean, Offshore and Arctic Engineering: Volume 5, Parts A and B. Shanghai, China. June 6–11, 2010. pp. 923-931. ASME. https://doi.org/10.1115/OMAE2010-20904
Download citation file:
15
Views
Related Proceedings Papers
Related Articles
New Frontiers in the Design of Steel Catenary Risers for Floating Production Systems
J. Offshore Mech. Arct. Eng (November,2001)
A Procedure to Include the Additional Fatigue Effects of Thermal Gradients in a B31.1 Butt Weld of Dissimilar Metals and Welding End Transition of Similar Metals for Design and Plant Life Extension
J. Pressure Vessel Technol (April,2012)
Failure of Locally Buckled Pipelines
J. Pressure Vessel Technol (May,2007)
Related Chapters
Openings
Guidebook for the Design of ASME Section VIII Pressure Vessels
Openings
Guidebook for the Design of ASME Section VIII Pressure Vessels, Third Edition
Start-Up, Shutdown, and Lay-Up
Consensus on Pre-Commissioning Stages for Cogeneration and Combined Cycle Power Plants