Municipal solid waste from Lee County and Hendry County is processed at the Lee County Solid Waste Resource Recovery Facility (the “Facility”). Lee County (the “County”) owns the Facility, which began commercial operation in December 1994. The Facility’s current permitted capacity is 1,320 tons per day (tpd), provided by two 660-tpd boiler units, at a reference waste of 5,000 Btu. Covanta Energy of Lee, Inc. operates and maintains the Facility under the terms of a Service Agreement with the County that runs through 2014. Covanta also designed and constructed the Facility. The expansion of this Facility will be the first new construction of a municipal waste combustion (MWC) unit since the New Source Performance Standards were adopted. Despite the County’s comprehensive recycling program, the amount of solid waste the County delivers to the Facility has increased each year since the Facility began operation, primarily due to population growth. In 1999, this amount reached the Facility’s guaranteed annual capacity of 372,300 tons. In 2000, the Facility processed over 392,000 tons of municipal solid waste, while the County landfilled nearly 44,000 additional tons of processible waste. Current population projections for Lee and Hendry Counties suggest that processible solid waste generation will continue to increase, reaching nearly 550,000 tons by 2010. Rather than landfilling processible waste generated in excess of the Facility’s current capacity, it is the County’s intention to expand the Facility by adding a third 660-tpd boiler unit which would increase the Facility’s permitted capacity to 1,980-tpd. The original application for the Facility’s Power Plant Site Certification anticipated such an expansion, including provisions for a third 660-tpd MWC unit. Certain provisions for this third unit were incorporated into the Facility’s design and construction as well. These included providing the physical space for the third unit, the physical space for an additional flue for the third unit, and sizing the tipping floor, refuse pit, and certain common equipment for three units. The expansion will require a second turbine-generator unit and expanded switchyard, an extension to the existing turbine-generator building, as well as the addition of a third boiler unit and air pollution control equipment. The expansion will also require modifications to certain equipment and systems common to all boiler units in order to meet the additional capacity requirements of the expanded Facility. As of February 2003, the County is waiting for the Florida Department of Environmental Protection to issue a draft PSD Air Permit and is on scheduled to go before the Power Plant Siting Board in September 2003.
Skip Nav Destination
11th North American Waste-to-Energy Conference
April 28–30, 2003
Tampa, Florida, USA
Conference Sponsors:
- Solid Waste Processing Division
ISBN:
0-7918-3665-7
PROCEEDINGS PAPER
Lee County Resource Recovery Facility Expansion Project Free
Sam M. Rosania
Sam M. Rosania
Malcolm Pirnie, Inc., Tampa, FL
Search for other works by this author on:
Sam M. Rosania
Malcolm Pirnie, Inc., Tampa, FL
Paper No:
NAWTEC11-1667, pp. 33; 1 page
Published Online:
January 5, 2009
Citation
Rosania, SM. "Lee County Resource Recovery Facility Expansion Project." Proceedings of the 11th North American Waste-to-Energy Conference. 11th Annual North American Waste-to-Energy Conference. Tampa, Florida, USA. April 28–30, 2003. pp. 33. ASME. https://doi.org/10.1115/NAWTEC11-1667
Download citation file:
148
Views
Related Proceedings Papers
Related Articles
A Survey of Nitrogen-Oxides Control Technology and the Development of a Low NO x Emissions Combustor
J. Eng. Power (July,1971)
An Approach to Determining the Economic Feasibility of Refuse-Derived Fuel and Materials Recovery Processing
J. Energy Resour. Technol (June,1980)
Biogasification of Municipal Solid Wastes
J. Energy Resour. Technol (June,1981)
Related Chapters
Introduction
Consensus on Operating Practices for Control of Water and Steam Chemistry in Combined Cycle and Cogeneration
Environment
Engineering the Everyday and the Extraordinary: Milestones in Innovation
Current Situations and Solutions of Urban Architectural Trash in China
International Conference on Measurement and Control Engineering 2nd (ICMCE 2011)