Great River Energy operates a waste-to-energy plant in Elk River, Minnesota. The plant burns 850 tons per day of refuse derived fuel (RDF) in three boilers, and its three steam turbines can produce 32 MW of electricity. In the largest of the three units, the No. 3 Boiler, steam generation was restricted by carbon monoxide (CO) and nitrogen oxides (NOx) emission limits. The plant had an interest in improving the combustion performance of the unit, thereby allowing higher average RDF firing rates while staying within emissions compliance. The project was initiated by an engineering site visit and evaluation. The boiler had a history of unstable burning on the stoker grate, which required periodic natural gas co-firing to reduce CO levels. As an outcome to the evaluation, it was decided to install a new overfire air (OFA) system to improve burnout of combustible gases above the grate. Current and new OFA arrangements were evaluated via Computational Fluid Dynamics (CFD) modeling. The results illustrated the limitations of the original OFA system (comprised of multiple rows of small OFA ports on the front and rear furnace walls), which generated inadequate mixing of air and combustible gases in the middle of the boiler. The modeling illustrated the advantages of large and fewer OFA nozzles placed on the side walls in an interlaced pattern, a configuration that has given excellent performance on over 45 biomass-fired boilers of similar design upgraded by Jansen Combustion and Boiler Technologies, Inc. (JANSEN). Installation of the new OFA system was completed in April of 2008. Subsequent testing of the No. 3 Boiler showed that it could reliably meet the state emission levels for CO and NOx (200 ppm and 250 ppm, respectively, corrected to 7% dry flue gas oxygen) while generating 24% more steam than a representative five month period prior to the upgrade. This paper describes the elements that led to a successful project, including: data collection, engineering analyses, CFD modeling, system design, equipment supply, installation, operator training, and startup assistance.
Skip Nav Destination
17th Annual North American Waste-to-Energy Conference
May 18–20, 2009
Chantilly, Virginia, USA
Conference Sponsors:
- Solid Waste Processing Division
ISBN:
978-0-7918-4880-7
PROCEEDINGS PAPER
Elements of a Successful Waste-to-Energy Boiler Upgrade
Samit J. Pethe,
Samit J. Pethe
Jansen Combustion and Boiler Technologies, Inc., Kirkland, WA
Search for other works by this author on:
Chris Dayton,
Chris Dayton
Jansen Combustion and Boiler Technologies, Inc., Kirkland, WA
Search for other works by this author on:
Marcel D. Berz,
Marcel D. Berz
Jansen Combustion and Boiler Technologies, Inc., Kirkland, WA
Search for other works by this author on:
Tim Peterson
Tim Peterson
Great River Energy, Elk River, MN
Search for other works by this author on:
Samit J. Pethe
Jansen Combustion and Boiler Technologies, Inc., Kirkland, WA
Chris Dayton
Jansen Combustion and Boiler Technologies, Inc., Kirkland, WA
Marcel D. Berz
Jansen Combustion and Boiler Technologies, Inc., Kirkland, WA
Tim Peterson
Great River Energy, Elk River, MN
Paper No:
NAWTEC17-2373, pp. 89-100; 12 pages
Published Online:
August 24, 2009
Citation
Pethe, SJ, Dayton, C, Berz, MD, & Peterson, T. "Elements of a Successful Waste-to-Energy Boiler Upgrade." Proceedings of the 17th Annual North American Waste-to-Energy Conference. 17th Annual North American Waste-to-Energy Conference. Chantilly, Virginia, USA. May 18–20, 2009. pp. 89-100. ASME. https://doi.org/10.1115/NAWTEC17-2373
Download citation file:
9
Views
Related Proceedings Papers
Related Articles
Effect of Air Distribution on Solid Fuel Bed Combustion
J. Energy Resour. Technol (June,1997)
Optimization of Co-Firing Burners
J. Thermal Sci. Eng. Appl (December,2016)
FLOX ® Combustion at High Pressure With Different Fuel Compositions
J. Eng. Gas Turbines Power (January,2008)
Related Chapters
Combined Cycle Power Plant
Energy and Power Generation Handbook: Established and Emerging Technologies
Energy Options and Terms: An Introduction
Energy Supply and Pipeline Transportation: Challenges & Opportunities
Lay-Up and Start-Up Practices
Consensus on Operating Practices for Control of Water and Steam Chemistry in Combined Cycle and Cogeneration