The implementation of the European-directive requiring a residence time of at least two seconds at a temperature above 850°C (1562°F), the change in waste characteristics, and the pursuit of higher thermal efficiencies has pushed many of the existing WtE plants in Europe to their operational limits. Most existing WtE plants were not designed to operate under these conditions and may require modifications to the combustion system. Within the SEGHERS better technology (SEGHERS) company, the SEGHERS-IBB-Prism was developed to deal with the cause of these problems, which are essentially related to insufficient mixing and burnout of the flue gases in the combustion area. In the Boiler Prism the flue gas flow is divided into two parallel flows prior to entering the first radiant pass of the boiler. This division is achieved by means of a prism shaped construction, which is water-cooled and integrated with the natural circulation system of the boiler. Additional secondary air injection nozzles are fitted in the prism. This technology results in a more uniform flue gas temperature and a complete combustion of the flue gas immediately above the prism. In the Bonn Plant, these improvements in the combustion process resulted in a decrease of the fireside cleaning requirements of more than 50%.
Skip Nav Destination
Close
Sign In or Register for Account
10th Annual North American Waste-to-Energy Conference
May 6–8, 2002
Philadelphia, Pennsylvania, USA
Conference Sponsors:
- Solid Waste Processing Division
ISBN:
0-7918-3594-4
PROCEEDINGS PAPER
Retrofit of WtE Boiler: Case Study on Bonn Plant
Mark Pe´rilleux
,
Mark Pe´rilleux
SEGHERS Scientec Matrix, Willebroek, Belgium
Search for other works by this author on:
Dirk Eeraerts
Dirk Eeraerts
SEGHERS Scientec Matrix North America, Marietta, GA
Search for other works by this author on:
Mark Pe´rilleux
SEGHERS Scientec Matrix, Willebroek, Belgium
Dirk Eeraerts
SEGHERS Scientec Matrix North America, Marietta, GA
Paper No:
NAWTEC10-1002, pp. 25-33; 9 pages
Published Online:
January 5, 2009
Citation
Pe´rilleux, M, & Eeraerts, D. "Retrofit of WtE Boiler: Case Study on Bonn Plant." Proceedings of the 10th Annual North American Waste-to-Energy Conference. 10th Annual North American Waste-to-Energy Conference. Philadelphia, Pennsylvania, USA. May 6–8, 2002. pp. 25-33. ASME. https://doi.org/10.1115/NAWTEC10-1002
Download citation file:
- Ris (Zotero)
- Reference Manager
- EasyBib
- Bookends
- Mendeley
- Papers
- EndNote
- RefWorks
- BibTex
- ProCite
- Medlars
Close
Sign In
4
Views
0
Citations
Related Proceedings Papers
Related Articles
Advanced Coal-Fired Power Plants
J. Energy Resour. Technol (March,2001)
Status of Topping Combustor Development for Second-Generation Fluidized Bed Combined Cycles
J. Eng. Gas Turbines Power (January,1992)
Energy Economy With a Variable Speed Drive in an Oxygen Trim Controlled Boiler House
J. Energy Resour. Technol (March,2005)
Related Chapters
A Case Study of Gasification CHP in Northern Italy in the European Context and Comparison to Traditional Combustion Systems
Proceedings of 2018 EEC/WTERT Conference
Development of Nuclear Boiler and Pressure Vessels in Taiwan
Companion Guide to the ASME Boiler and Pressure Vessel Code, Volume 3, Third Edition
Combined Cycle Power Plant
Energy and Power Generation Handbook: Established and Emerging Technologies