In 1997, the Hampton/NASA Steam Plant implemented a successfully re-engineered wet cleaning process for controlling exposure to lead and cadmium during the cleaning and maintenance of electrostatic precipitators. The following year we were ready to apply the lessons learned to the initial furnace cleaning tasks. As part of the initial process review, industrial hygiene (IH) tests were done during furnace cleaning using the in practice methods. Testing was done for respirable lead and cadmium. Lead exposure was found to be over the action level, but cadmium exposures were just around non-detect levels. May of 1999 the facility became aware, through an IWSA-MWMA-ASME Safety and Health Seminar, that other WTE facilities were testing for arsenic as well. Another set of tests were performed that same month which included tests for respirable arsenic. The results showed that arsenic was present and found to be over the action level, and one test point was especially high during the sifting hopper cleaning part of the procedure. These results were surprising since IH testing for these tasks during 1987 indicated much lower exposures. It was decided the procedures had to be changed. Two process improvement outcomes were targeted: 1) To prevent accidents, injuries and close calls during the furnace cleaning task, a safer procedure for the task of furnace cleaning would be developed. 2) The new procedure must control cadmium, lead and arsenic exposures during furnace and sifting hopper cleaning tasks, to below OSHA Action Levels. The new procedure standardized cleaning methods and included use of water right from the initial entry into the furnace. Operators had respirators upgraded to Positive Pressure Air Purifying Respirators (PAPR) and wore special disposable coveralls. Subsequent Industrial Hygiene testing showed that exposure levels could be reduced to less than the OSHA Action Level and Permissible Exposure Limits for lead and arsenic. The newly developed “wet cleaning” procedure provided a safer standardized procedure that the Operators helped to develop, and Operators feel safer doing the task. The new procedure has also reduced task worker exposures to Lead and Arsenic to below OSHA Action Levels.
Skip Nav Destination
10th Annual North American Waste-to-Energy Conference
May 6–8, 2002
Philadelphia, Pennsylvania, USA
Conference Sponsors:
- Solid Waste Processing Division
ISBN:
0-7918-3594-4
PROCEEDINGS PAPER
Lead and Arsenic Exposure Control for Waste to Energy Furnace Cleaning
John S. Austin,
John S. Austin
Hampton/NASA Steam Plant, Hampton, VA
Search for other works by this author on:
Michael E. Croft
Michael E. Croft
Hampton/NASA Steam Plant, Hampton, VA
Search for other works by this author on:
John S. Austin
Hampton/NASA Steam Plant, Hampton, VA
Michael E. Croft
Hampton/NASA Steam Plant, Hampton, VA
Paper No:
NAWTEC10-1026, pp. 221-224; 4 pages
Published Online:
January 5, 2009
Citation
Austin, JS, & Croft, ME. "Lead and Arsenic Exposure Control for Waste to Energy Furnace Cleaning." Proceedings of the 10th Annual North American Waste-to-Energy Conference. 10th Annual North American Waste-to-Energy Conference. Philadelphia, Pennsylvania, USA. May 6–8, 2002. pp. 221-224. ASME. https://doi.org/10.1115/NAWTEC10-1026
Download citation file:
7
Views
Related Proceedings Papers
Related Articles
Postirradiation Testing of High Temperature Reactor Spherical Fuel Elements Under Accident Conditions
J. Eng. Gas Turbines Power (April,2010)
Modeling of a Coal-Fired Natural Circulation Boiler
J. Energy Resour. Technol (June,2007)
Related Chapters
A Case Study of Gasification CHP in Northern Italy in the European Context and Comparison to Traditional Combustion Systems
Proceedings of 2018 EEC/WTERT Conference
Introduction
Silver Nanoparticles: Properties, Synthesis Techniques, Characterizations, Antibacterial and Anticancer Studies
Developing Human Performance Measures (PSAM-0207)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)