In metropolitan areas, when a highway underpass project is being planned to go beneath an existing railway corridor, there are a number of concerns that could have an impact on the project. For example, will the underpass construction impact the existing railway operations? How to maintain the construction safety in both rail and highway operations? This paper brings construction technology using I-girder systems to provide a solution for highway underpass projects constructing beneath the existing rail corridors. The I-girder systems have been proved as a reliable method for highway underpass construction without the interruption of railway operations. This type of I-girder systems has been widely used in several countries as a temporary “bridge” structure in support of dynamic rail movements during underpass construction. Depending on the spans of underpass structures, a contractor can decide the number of I-girder units to be assembled and installed on site. This paper describes the construction procedures of the I-girder systems installation and daily inspection processes. A case study is used to demonstrate the applicability of I-girder systems in ensuring underpass construction smoothly while maintaining existing railway operations in a safety manner. During the construction of underpass, the contractor encountered geotechnical issues that had a severe impact on the construction safety and the integrity of foundation. This paper further discusses strategies that were used to mitigate the potential building collapses and foundation failures. It is concluded the method of I-girder systems is capable of supporting railway dynamic movements during highway underpass construction.
Skip Nav Destination
2015 Joint Rail Conference
March 23–26, 2015
San Jose, California, USA
Conference Sponsors:
- Rail Transportation Division
ISBN:
978-0-7918-5645-1
PROCEEDINGS PAPER
I-Girders Method Used to Support Existing Railway Operations During Highway Underpass Construction
Chun-Hsing Ho,
Chun-Hsing Ho
Northern Arizona University, Flagstaff, AZ
Search for other works by this author on:
Junyi Shan,
Junyi Shan
Northern Arizona University, Flagstaff, AZ
Search for other works by this author on:
Feiyue Wang,
Feiyue Wang
Northern Arizona University, Flagstaff, AZ
Search for other works by this author on:
Yiyang Chen
Yiyang Chen
Northern Arizona University, Flagstaff, AZ
Search for other works by this author on:
Chun-Hsing Ho
Northern Arizona University, Flagstaff, AZ
Junyi Shan
Northern Arizona University, Flagstaff, AZ
Feiyue Wang
Northern Arizona University, Flagstaff, AZ
Yiyang Chen
Northern Arizona University, Flagstaff, AZ
Paper No:
JRC2015-5651, V001T01A008; 7 pages
Published Online:
June 10, 2015
Citation
Ho, C, Shan, J, Wang, F, & Chen, Y. "I-Girders Method Used to Support Existing Railway Operations During Highway Underpass Construction." Proceedings of the 2015 Joint Rail Conference. 2015 Joint Rail Conference. San Jose, California, USA. March 23–26, 2015. V001T01A008. ASME. https://doi.org/10.1115/JRC2015-5651
Download citation file:
12
Views
Related Proceedings Papers
Related Articles
The Use of Risk-Based Approaches in Post-Construction Standards
J. Pressure Vessel Technol (August,2000)
Lateral Oscillations of Rail Vehicles
Trans. ASME (November,1935)
Oscillations of Suspension Bridges
J. Appl. Mech (March,1943)
Related Chapters
Section VIII: Division 2–Alternative Rules
Companion Guide to the ASME Boiler & Pressure Vessel Codes, Volume 2, Sixth Edition
Mechanics of Materials
Engineering Practice with Oilfield and Drilling Applications
Submarine Sediment Scouring in Sea-Crossing Bridge Locations (Xiamen Rail-Cum-Road Bridge on Fuzhou-Xiamen Railroad Taken as an Example)
Geological Engineering: Proceedings of the 1 st International Conference (ICGE 2007)