Federal funding of high speed rail projects is conditioned upon full compliance with the National Environmental Policy Act (NEPA) and other federal laws. The Federal Railroad Administration (FRA) often uses tiering to complete the NEPA studies for high-speed rail and other intercity passenger rail projects. Tiering involves two separate rounds of NEPA review. Typically, a Tier 1 study evaluates potential improvements in a lengthy corridor and results in decisions on broad issues such as the need for the project, facility type, and the general location; Tier 2 involves more detailed alignment decisions and development of mitigation measures for individual projects within the corridor. This paper focuses on the use of tiering for high-speed and intercity passenger rail projects. As background for the discussion of tiering, this paper will first discuss: basic NEPA requirements; FRA’s approach to NEPA compliance; and the importance of NEPA compliance in the allocation of competitive grants for high-speed rail projects. The paper will then focus on the issue of tiering. It will describe the legal framework for preparing a tiered NEPA study; how tiering has been used on rail and other non-rail transportation projects; and important issues to consider in developing a tiered study. It will conclude with a list of best practices for developing a tiered NEPA study, focusing in particular on high-speed rail projects.
Skip Nav Destination
2010 Joint Rail Conference
April 27–29, 2010
Urbana, Illinois, USA
Conference Sponsors:
- Rail Transportation Division
ISBN:
978-0-7918-4906-4
PROCEEDINGS PAPER
NEPA Compliance for High-Speed Rail Projects: The Use of Tiering
William G. Malley,
William G. Malley
Perkins Coie LLP, Washington, DC
Search for other works by this author on:
Albert M. Ferlo, Jr.
Albert M. Ferlo, Jr.
Perkins Coie LLP, Washington, DC
Search for other works by this author on:
William G. Malley
Perkins Coie LLP, Washington, DC
Albert M. Ferlo, Jr.
Perkins Coie LLP, Washington, DC
Paper No:
JRC2010-36231, pp. 493-502; 10 pages
Published Online:
October 28, 2010
Citation
Malley, WG, & Ferlo, AM, Jr. "NEPA Compliance for High-Speed Rail Projects: The Use of Tiering." Proceedings of the 2010 Joint Rail Conference. 2010 Joint Rail Conference, Volume 1. Urbana, Illinois, USA. April 27–29, 2010. pp. 493-502. ASME. https://doi.org/10.1115/JRC2010-36231
Download citation file:
8
Views
Related Proceedings Papers
Related Articles
Dynamics of a Current Collector for a High-Speed Railway
J. Eng. Ind (May,1975)
Making Tracks
Mechanical Engineering (February,2016)
Accurate Representation of the Rail Geometry for Multibody System Applications
J. Comput. Nonlinear Dynam (January,2010)
Related Chapters
Submarine Sediment Scouring in Sea-Crossing Bridge Locations (Xiamen Rail-Cum-Road Bridge on Fuzhou-Xiamen Railroad Taken as an Example)
Geological Engineering: Proceedings of the 1 st International Conference (ICGE 2007)
Modified Sequential Linear Power Flow Method for High-Speed Railway Power Supply System
International Conference on Mechanical and Electrical Technology, 3rd, (ICMET-China 2011), Volumes 1–3
Probabilistic Safety Assessment of Level Crossing System in Japanese Railway (PSAM-0125)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)