Combining with the actual situation of China’s railway construction, this paper introduces the key technologies of design and construction of high-speed railway, such as the scheme optimization of subgrade, bridge and tunnel, technical standard, deformation control, advance geology forecast and settlement observation, etc. It also discusses the design and construction problems on the slab layout and interface of CRTS II slab track on bridge section, switch area, subgrade area and the transition with different track structures.
Volume Subject Area:
Railroad Infrastructure Engineering