This paper introduces the applied comprehensive inspection technologies that satisfy the demand of safety and high operation efficiency on new-constructed PDLs and speed-up existing lines in China, including the improved static and dynamic supervision system, advanced comprehensive inspection train, accurate specified inspection devices, scientific data analysis and evaluation method and current regulations of inspection management. The paper also introduces the application status of the comprehensive inspection technologies in China and its development expectation.
Volume Subject Area:
Railroad Infrastructure Engineering
This content is only available via PDF.
Copyright © 2010
by ASME
You do not currently have access to this content.