This article aims to describe the best industry practices followed by the line maintenance area of the Ocensa pipeline, which can be divided into 4 large steps that follow a PHVA cycle of the activity, which includes relief planning, the execution of the same, the verification and geotechnical monitoring, closure and feedback.
Volume Subject Area:
Geohazard Considerations for Design and Construction
This content is only available via PDF.
Copyright © 2017 by ASME
You do not currently have access to this content.