As of the date this paper is written pipelines in South America comprises 113000 kms of transmission lines including Oil, Gas, Condensates, and refined products from which approximately 17% (19400 kms) crosses the Andes reaching elevations up to near 5000mts. Rugged terrain combined with the geology, weather conditions (especially rain intensity) and continuous pipe ruptures in the past impose serious challenges for the pipeline industry that makes the design, construction and operation substantially different from other pipelines in the world. The records have shown that the threat of Ground movement/weather-related pipeline ruptures in the Andes plays a significant role since the percentage of the risk associated with geotechnical causes is substantially higher than any other parts such as Europe or United States. Thus the rate of pipeline failures due to natural forces is significant higher than the average industry. Peru LNG is a 406km × 34in gas pipeline transporting natural gas from the jungle side of Peru to the Pacific Coast where a LNG terminal has been installed. Peru LNG’s pipeline currently holds the record of being the highest Gas Pipeline of the world with a maximum elevation of 4901 meters above sea level. Project completion was done in May 2010 and lessons learnt from similar projects were taken into account since project designs. This paper is divided in two parts. First, it compares pipeline ruptures frequencies due to natural forces in the Andes with other pipelines in different terrains based on historical cases compiled by the authors. Secondly, it explains the different phases of Pipeline Project in rugged terrain from the conceptual design until the operations stage and the role of Pipeline Geotechnical Engineers in this process based on PERU LNG’s pipeline experience. It also describes some of the main features of the PLNG pipeline project. A comprehensive flow chart provides general guidance for future pipeline projects in similar conditions.
Skip Nav Destination
ASME 2013 International Pipeline Geotechnical Conference
July 24–26, 2013
Bogota, Colombia
Conference Sponsors:
- Pipeline Systems Division
ISBN:
978-0-7918-5577-5
PROCEEDINGS PAPER
The Challenge of Crossing the Andes: A Data Base Analysis and Peru LNG Project Description
Ariel Gasca Cardenas,
Ariel Gasca Cardenas
Hunt Oil Company, Dallas, TX
Search for other works by this author on:
Edilberto Gutierrez
Edilberto Gutierrez
COLP SAC, Lima, Perú
Search for other works by this author on:
Ariel Gasca Cardenas
Hunt Oil Company, Dallas, TX
Edilberto Gutierrez
COLP SAC, Lima, Perú
Paper No:
IPG2013-1951, V001T02A007; 6 pages
Published Online:
January 20, 2014
Citation
Cardenas, AG, & Gutierrez, E. "The Challenge of Crossing the Andes: A Data Base Analysis and Peru LNG Project Description." Proceedings of the ASME 2013 International Pipeline Geotechnical Conference. ASME 2013 International Pipeline Geotechnical Conference. Bogota, Colombia. July 24–26, 2013. V001T02A007. ASME. https://doi.org/10.1115/IPG2013-1951
Download citation file:
13
Views
Related Proceedings Papers
Related Articles
Latent Customer Needs Elicitation by Use Case Analogical Reasoning From Sentiment Analysis of Online Product Reviews
J. Mech. Des (July,2015)
Developing Innovative Deep Water Pipeline Construction Techniques with Physical Models
J. Offshore Mech. Arct. Eng (February,2007)
Notch Ductilities of Rich Natural Gas Transmission Line Pipes for Arresting Propagating Shear Fracture
J. Offshore Mech. Arct. Eng (February,1987)
Related Chapters
Better Risk Management for Underground Pipelines and Tunnels Using Sound Geotechnical Interpretation
Geological Engineering: Proceedings of the 1 st International Conference (ICGE 2007)
Pipeline Integrity and Security
Continuing and Changing Priorities of the ASME Boiler & Pressure Vessel Codes and Standards
USE OF A GEOHAZARD MANAGEMENT PROGRAM TO REDUCE PIPELINE FAILURE RATES
Pipeline Integrity Management Under Geohazard Conditions (PIMG)