TransCanada was faced with a significant challenge to inspect a 941 km NPS 48 pipeline. The options for the inline inspection (ILI) were multiple segments which would cause an increased cost with new pigging facilities required and a delay to the ILI schedule or attempt to pig the longest natural gas pipeline section in North America. The extraordinary proposal would require a massive 48″ combination Magnetic Flux Leakage (MFL) tool to traverse a high-speed gas pipeline 941km from Burstall, Saskatchewan to Ile des Chenes, Manitoba, Canada. Given the alternative of the installation of 3 additional launcher and receiver stations and the risk to overall project schedule from extended inspection operations, TransCanada took the bold decision to perform an MFL inspection in a single pass. However, as expected, this option created a new set of challenges to guarantee first run success in one of the harshest environments for an ILI tool and in a line where the cleanliness condition was unknown. This last factor, was a critical concern as the volumes of debris that could be collected with the highly aggressive MFL tool brushes, could easily and very quickly have led to very significant debris build up during inspection that at best would likely cause degraded data leading to an unwanted re-run and at worst the possibility of a stuck pig and subsequent retrieval program. From a project perspective either occurance was considered to be mission critical — if either occurred there was no easy solution to collecting the much needed condition data of the pipeline. In July 2017, a successful VECTRA HD GEMINI inspection was completed. This paper discusses the main program risks, mitigation steps taken over and above a standard ILI run. Key considerations and actions taken relating to additional engineering and tool modifications to various components of the inspection vehicle itself will be discussed. Lastly, insight will be given into an extensive smart cleaning program developed with the ILI vendor, using a combination of mechanical cleaning associated and debris level assessment, specifically designed and tailored for the project to ensure that the pipeline was both ready for ILI and that cleaning had reached optimum for ILI so that full, high quality MFL data would be collected the first time.
Skip Nav Destination
2018 12th International Pipeline Conference
September 24–28, 2018
Calgary, Alberta, Canada
Conference Sponsors:
- Pipeline Division
ISBN:
978-0-7918-5186-9
PROCEEDINGS PAPER
Achieving North American Record for Longest Intelligent Inspection of a Natural Gas Pipeline
Sheshi Epur,
Sheshi Epur
TransCanada Pipelines, Calgary, AB, Canada
Search for other works by this author on:
Aaron Schartner,
Aaron Schartner
TransCanada Pipelines, Calgary, AB, Canada
Search for other works by this author on:
Frank Sander
Frank Sander
Baker Hughes, a GE company, Calgary, AB, Canada
Search for other works by this author on:
Sheshi Epur
TransCanada Pipelines, Calgary, AB, Canada
Aaron Schartner
TransCanada Pipelines, Calgary, AB, Canada
Frank Sander
Baker Hughes, a GE company, Calgary, AB, Canada
Paper No:
IPC2018-78601, V001T03A018; 7 pages
Published Online:
November 6, 2018
Citation
Epur, S, Schartner, A, & Sander, F. "Achieving North American Record for Longest Intelligent Inspection of a Natural Gas Pipeline." Proceedings of the 2018 12th International Pipeline Conference. Volume 1: Pipeline and Facilities Integrity. Calgary, Alberta, Canada. September 24–28, 2018. V001T03A018. ASME. https://doi.org/10.1115/IPC2018-78601
Download citation file:
23
Views
0
Citations
Related Proceedings Papers
Related Articles
The Design of a Mechanical Damage Inspection Tool Using Dual Field Magnetic Flux Leakage Technology
J. Pressure Vessel Technol (August,2005)
Profiles of Two JOMAE Associate Editors (A Continuing Series)
J. Offshore Mech. Arct. Eng (October,2021)
Non-Contact Measurement of Residual Magnetization Caused by Plastic Deformation of Steel
ASME J Nondestructive Evaluation (August,2020)
Related Chapters
DYNAMIC GEOHAZARD MANAGEMENT IN CHALLENGING ENVIRONMENT
Pipeline Integrity Management Under Geohazard Conditions (PIMG)
HIGH STRAIN WELD SOLUTIONS FOR GEOHAZARD ACTIVE ENVIRONMENT
Pipeline Integrity Management Under Geohazard Conditions (PIMG)
Pipeline Integrity and Security
Continuing and Changing Priorities of the ASME Boiler & Pressure Vessel Codes and Standards