SAIPEM has been awarded the engineering, procurement and construction of “El Encino - Topolobampo” Natural Gas Pipeline Project in Mexico. The 30” pipeline begins in El Encino, in the state of Chihuahua, and terminates in Topolobampo, in the state of Sinaloa. It runs in a West-South West direction perpendicularly crossing the “Sierra Madre Occidental”, a mountain range characterized by uneven morphology with deep and narrow valleys and steep slopes. Near the village of Santa Matilde, before reaching the Chinipas River, the pipeline route has to overcome a 150 meters high steep slope on the left side of the valley of Chinipas. This slope features a sub vertical rocky cliff with a 55 meters drop in the upper section. A trenchless crossing of the slope was designed and executed to safely cross the steep slope by means of raise borer and tunnel. Since the area was nearly inaccessible, SAIPEM, for the first time in the design of a trenchless crossing of slopes, has performed the geomechanical study using a remote sensing process based on the Structure from Motion (SfM) technique for a three-dimensional reconstruction of the outcrop of the cliff. The activity has been carried out in collaboration with the Department of Earth, Life and Environmental Science of the University of Urbino. The results of the study led to the optimization of the trenchless geometry maintaining the raise bore into the competent rock avoiding frequent lithological variations critical during the drilling and identifying a suitable tunnel entrance location.
Skip Nav Destination
2016 11th International Pipeline Conference
September 26–30, 2016
Calgary, Alberta, Canada
Conference Sponsors:
- Pipeline Division
ISBN:
978-0-7918-5026-8
PROCEEDINGS PAPER
The Design and Construction of the Chinipas Slope Pipeline Crossing
Agostino Napolitano,
Agostino Napolitano
Saipem SpA, Fano, Italy
Search for other works by this author on:
Alessandro Fabbri,
Alessandro Fabbri
Saipem SpA, Fano, Italy
Search for other works by this author on:
Marco Menichetti,
Marco Menichetti
University of Urbino, Urbino, Italy
Search for other works by this author on:
Francesco Troiani
Francesco Troiani
Sapienza University, Rome, Italy
Search for other works by this author on:
Agostino Napolitano
Saipem SpA, Fano, Italy
Guido Guidotti
Saipem SpA, Fano, Italy
Andrea Marsili
Saipem SpA, Fano, Italy
Alessandro Fabbri
Saipem SpA, Fano, Italy
Marco Menichetti
University of Urbino, Urbino, Italy
Francesco Troiani
Sapienza University, Rome, Italy
Paper No:
IPC2016-64009, V002T02A001; 6 pages
Published Online:
November 10, 2016
Citation
Napolitano, A, Guidotti, G, Marsili, A, Fabbri, A, Menichetti, M, & Troiani, F. "The Design and Construction of the Chinipas Slope Pipeline Crossing." Proceedings of the 2016 11th International Pipeline Conference. Volume 2: Pipeline Safety Management Systems; Project Management, Design, Construction and Environmental Issues; Strain Based Design; Risk and Reliability; Northern Offshore and Production Pipelines. Calgary, Alberta, Canada. September 26–30, 2016. V002T02A001. ASME. https://doi.org/10.1115/IPC2016-64009
Download citation file:
12
Views
Related Proceedings Papers
Related Articles
Modeling of Filter Cake Composition in Maximum Reservoir Contact and Extended Reach Horizontal Wells in Sandstone Reservoirs
J. Energy Resour. Technol (May,2017)
Energy Usage in Natural Gas Pipeline Applications
J. Eng. Gas Turbines Power (February,2012)
Modeling Flow of a Biviscous Fluid From Borehole Into Rock Fracture
J. Appl. Mech (January,2006)
Related Chapters
Pipeline Integrity and Security
Continuing and Changing Priorities of the ASME Boiler & Pressure Vessel Codes and Standards
Introduction
Pipeline Geo-Environmental Design and Geohazard Management
Better Risk Management for Underground Pipelines and Tunnels Using Sound Geotechnical Interpretation
Geological Engineering: Proceedings of the 1 st International Conference (ICGE 2007)