In response to strong customer demand, Enbridge Midstream Inc. (Enbridge) expanded its’ crude oil contract terminal facilities which included a new terminal near Hardisty, Alberta. Commissioned in 2009, the new Hardisty Contract Tankage (HCT) terminal provides services to accumulate medium- and long-term liquid crude volumes on a fee-for-service basis. Stantec Consulting Ltd. (Stantec) was selected to perform the conceptual and detailed design based on their terminal experience and working relationship with Enbridge. Given the inherent intermittent operation of this facility it was deemed critical to design integrity management into the facility. The conceptual and detailed design project team included members from Enbridge’s Integrity Management team to enhance the design.
Skip Nav Destination
2010 8th International Pipeline Conference
September 27–October 1, 2010
Calgary, Alberta, Canada
Conference Sponsors:
- International Petroleum Technology Institute and the Pipeline Division
ISBN:
978-0-7918-4422-9
PROCEEDINGS PAPER
Hardisty Contract Tankage Project: Design of a System for Long-Term Storage, Heating and Transporting Heavy Crude Oil in Cold Climates
Jamie Bagan,
Jamie Bagan
Stantec Consulting Ltd., Edmonton, AB, Canada
Search for other works by this author on:
Susan Larson,
Susan Larson
Enbridge Pipeline Inc., Edmonton, AB, Canada
Search for other works by this author on:
Gilles Orieux,
Gilles Orieux
Stantec Consulting Ltd., Edmonton, AB, Canada
Search for other works by this author on:
Dean Thieson,
Dean Thieson
Enbridge Pipeline Inc., Edmonton, AB, Canada
Search for other works by this author on:
Greg Wengreniuk
Greg Wengreniuk
Stantec Consulting Ltd., Edmonton, AB, Canada
Search for other works by this author on:
Jamie Bagan
Stantec Consulting Ltd., Edmonton, AB, Canada
Susan Larson
Enbridge Pipeline Inc., Edmonton, AB, Canada
Gilles Orieux
Stantec Consulting Ltd., Edmonton, AB, Canada
Dean Thieson
Enbridge Pipeline Inc., Edmonton, AB, Canada
Greg Wengreniuk
Stantec Consulting Ltd., Edmonton, AB, Canada
Paper No:
IPC2010-31654, pp. 305-310; 6 pages
Published Online:
April 4, 2011
Citation
Bagan, J, Larson, S, Orieux, G, Thieson, D, & Wengreniuk, G. "Hardisty Contract Tankage Project: Design of a System for Long-Term Storage, Heating and Transporting Heavy Crude Oil in Cold Climates." Proceedings of the 2010 8th International Pipeline Conference. 2010 8th International Pipeline Conference, Volume 3. Calgary, Alberta, Canada. September 27–October 1, 2010. pp. 305-310. ASME. https://doi.org/10.1115/IPC2010-31654
Download citation file:
11
Views
Related Proceedings Papers
Related Articles
Heat Pump Water Heater Control Strategy Optimization for Cold Climates
J. Sol. Energy Eng (February,2016)
The Use of Serpentine Earth Coils in Ground Coupled Heat Pump Systems
J. Sol. Energy Eng (November,1984)
Horizontal Inlets of Water Storage Tanks With Low Disturbance of Stratification
J. Sol. Energy Eng (October,2016)
Related Chapters
Evaluation of Moisture Accumulation in Composite Roof Decks in High Humidity Environments such as Natatoriums in Cold Climates Using Hygrothermal Modeling
Roofing Research and Standards Development: 10th Volume
General and Historical Information
Pipeline Integrity Assurance: A Practical Approach
A PSA Update to Reflect Procedural Changes (PSAM-0217)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)