Pipeline facilities are ageing and will likely soon come under closer scrutiny from federal regulation. It is imperative that sound reliability based inspection procedures be established that meet the goals of an organization while controlling time and cost. DNV Columbus has developed a statistically based sequential inspection decision support system for this purpose. This system was implemented for an international petroleum company and quickened the inspection process by making a “stop inspections” or a “continue inspections” decision after each inspection at a facility. This system allows inspections to be stopped because the desired reliability metrics have been met. This means that the point of diminishing returns has been met based on inspections that did not reveal a significant amount of corrosion. At this point, further sampling would provide minimal additional value to the reliability assessment. Inspections can also be stopped because the estimated reliability metrics have not been met. Stopping for this reason indicates the facility may need more significant repair or replacement. Engineers and managers can then make a decision that includes a variety of factors including safety and the economic feasibility of alternates. In contrast, when using this method, inspections continue because insufficient data have been collected to determine whether the reliability metrics have been met. This system will be illustrated with actual data. It will also describe the use of four key safety factors in developing site specific reliability goals. These factors are consequence, off site migration probability, product type, and facility size. This work can result in a major savings in time and financial expenditures for an inspection cycle. This reliability based inspection methodology leads to the following improvements: 1) Quicker decisions to save time and money, and allows more sites to be inspected in a timelier manner, 2) The reliability of a group of inspections performed is quantified after each inspection, 3) Results at a facility are broken down by database driven categories into a scorecard, 4) Methodology kept generic to be easily adapted to a wide variety of situations.
Skip Nav Destination
2010 8th International Pipeline Conference
September 27–October 1, 2010
Calgary, Alberta, Canada
Conference Sponsors:
- International Petroleum Technology Institute and the Pipeline Division
ISBN:
978-0-7918-4422-9
PROCEEDINGS PAPER
Reliability Based Facility Risk Assessment
William V. Harper,
William V. Harper
Otterbein College, Westerville, OH
Search for other works by this author on:
David J. Stucki,
David J. Stucki
Otterbein College, Westerville, OH
Search for other works by this author on:
Taylor M. Shie,
Taylor M. Shie
DNV Columbus, Inc., Dublin, OH
Search for other works by this author on:
Ray J. Davies
Ray J. Davies
DNV Columbus, Inc., Dublin, OH
Search for other works by this author on:
William V. Harper
Otterbein College, Westerville, OH
David J. Stucki
Otterbein College, Westerville, OH
Taylor M. Shie
DNV Columbus, Inc., Dublin, OH
Ray J. Davies
DNV Columbus, Inc., Dublin, OH
Paper No:
IPC2010-31352, pp. 247-253; 7 pages
Published Online:
April 4, 2011
Citation
Harper, WV, Stucki, DJ, Shie, TM, & Davies, RJ. "Reliability Based Facility Risk Assessment." Proceedings of the 2010 8th International Pipeline Conference. 2010 8th International Pipeline Conference, Volume 3. Calgary, Alberta, Canada. September 27–October 1, 2010. pp. 247-253. ASME. https://doi.org/10.1115/IPC2010-31352
Download citation file:
14
Views
Related Proceedings Papers
Related Articles
Risk-Based Maintenance Planning for Deteriorating Pressure Vessels With Multiple Defects
J. Pressure Vessel Technol (August,2017)
Facility Integrity Management and Assessment of Associated Risk Conditions
J. Pressure Vessel Technol (August,2016)
A New Risk Assessment Model to Check Safety Threats to Long-Distance Pipelines
J. Pressure Vessel Technol (October,2022)
Related Chapters
Port State Control (PSC) Targetting System with Discriminant Analysis (PSAM-0321)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)
Probabilistic Approaches for Analysis of Inspection Data of Pipelines
Asset Integrity Management of Critical Infrastructure
Pipeline Integrity
Pipeline Design & Construction: A Practical Approach, Third Edition