A portion of Enbridge Pipelines 30 inch crude oil/NGL pipeline runs from Bay City, Michigan to Sarnia, Ontario. A geometry tool found a topside dent indication and GPS data indicated that the dent was located in the Saginaw River which is considered Coast-guard navigable. This pipe segment is located within a defined high consequence area making Pipeline and Hazardous Materials Safety Administration (PHMSA) timing applicable. On top of the normal problems associated with digging in a river, the riverbed soil was known to contain dioxin contamination related to its industrial history. This paper provides an overview of the practical problems encountered in completing this dig. Governmental construction permitting proved to be the most difficult aspect of the work. Contaminated soils caused Enbridge to hire a specialized water handling company. Significant engineering challenges included design and installation of a 100 × 50 foot coffer dam with 70 foot long sheets. The coffer dam design required a flood plain erosion study. After many months of permitting process, all required permits were obtained and construction was started. The construction included three major elements, water handling, coffer dam installation and excavation of the suspected defect. After 2 months of work to uncover the suspected dent, it was located and analyzed. The dent did not meet Enbridge repair criteria, but mechanical reinforcement was installed as a precaution. Final steps included backfilling and coffer dam removal. From start to finish the construction portion of the dig took about 5 months to complete.
Skip Nav Destination
2008 7th International Pipeline Conference
September 29–October 3, 2008
Calgary, Alberta, Canada
Conference Sponsors:
- International Petroleum Technology Institute and the Pipeline Division
ISBN:
978-0-7918-4860-9
PROCEEDINGS PAPER
Pipeline Integrity Excavation Challenge in a High Consequence Area
Joseph J. Richardson,
Joseph J. Richardson
Enbridge Energy Partners, LLC, Griffith, IN
Search for other works by this author on:
Vincent P. Kolbuck
Vincent P. Kolbuck
Enbridge Energy Partners, LLC, Griffith, IN
Search for other works by this author on:
Joseph J. Richardson
Enbridge Energy Partners, LLC, Griffith, IN
Vincent P. Kolbuck
Enbridge Energy Partners, LLC, Griffith, IN
Paper No:
IPC2008-64343, pp. 159-165; 7 pages
Published Online:
June 29, 2009
Citation
Richardson, JJ, & Kolbuck, VP. "Pipeline Integrity Excavation Challenge in a High Consequence Area." Proceedings of the 2008 7th International Pipeline Conference. 2008 7th International Pipeline Conference, Volume 4. Calgary, Alberta, Canada. September 29–October 3, 2008. pp. 159-165. ASME. https://doi.org/10.1115/IPC2008-64343
Download citation file:
14
Views
Related Proceedings Papers
Related Articles
Operating Experiences in the Steam and Power Department of the South’s First Alkali Plant
Trans. ASME (October,1937)
New Developments in Hydroelectric Power-Plant Design
Trans. ASME (January,1922)
Effect of Transitions in the Water Table and Soil Moisture Content on the Cathodic Protection of Buried Pipelines
J. Pressure Vessel Technol (February,2011)
Related Chapters
Pipeline Integrity and Security
Continuing and Changing Priorities of the ASME Boiler & Pressure Vessel Codes and Standards
Pipeline Integrity
Pipeline Design & Construction: A Practical Approach, Third Edition
Use of PSA in Lisencing of EPR 1600 in Finland (PSAM-0160)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)