The proposed construction of a crude oil pipeline through a residential area north of Salt Lake City, Utah, with an alignment that crossed the Wasatch fault provides an interesting case history of the numerous uncertainties and competing constraints associated with designing a pipeline fault crossing in an urban environment. Several issues raised during project design needed to be resolved with representatives of the city in which the project was located; the city had obtained technical input from the state geological survey and a local pipeline engineering specialist. The definition of the fault location and design fault displacement required reconciling suggested fault displacement estimates that ranged from 2.4 m to 4.2 m. The desire on the part of the pipeline owner and the city to have the oil pipeline buried relatively deeply (at least 1.5 m of cover) needed to be resolved with the fact that improved pipeline performance for imposed fault displacements typically is achieved with shallower soil cover. Special trench construction measures to increase the pipeline fault displacement capacity, such as reduced burial combined with protective concrete slabs above the pipeline or use of geofoam material as trench backfill, needed to be balanced with potential consequences on normal pipeline operational and maintenance activities, as well as street maintenance by the city. Increases in pipe wall thickness, that would permit an increase in the burial depth of the pipeline, needed to be balanced with concerns regarding potential problems that could be created with the measurement quality of internal inspection devices. The requirement that the pipeline be located beneath city streets, including a 90° corner 125 m from the fault crossing, limited the ability of the pipeline to distribute axial strain developed as a result of the fault displacement and led to optimization of the pipeline bend geometry with respect to available space and impact on existing utility lines. Resolving these issues was facilitated by examining the pipeline response to a variety of postulated design alternatives using finite element analyses. The final design recommendations that satisfied the owner and city provided a reasonable assurance that the pipeline would maintain pressure integrity for a fault displacement of 3.75 m.
Skip Nav Destination
2008 7th International Pipeline Conference
September 29–October 3, 2008
Calgary, Alberta, Canada
Conference Sponsors:
- International Petroleum Technology Institute and the Pipeline Division
ISBN:
978-0-7918-4857-9
PROCEEDINGS PAPER
Geotechnical Challenges for Design of a Crude Oil Pipeline Across an Active Normal Fault in an Urban Area
Jeffrey R. Keaton,
Jeffrey R. Keaton
MACTEC Engineering and Consulting, Los Angeles, CA
Search for other works by this author on:
Douglas G. Honegger
Douglas G. Honegger
D.G. Honegger Consulting, Arroyo Grande, CA
Search for other works by this author on:
Jeffrey R. Keaton
MACTEC Engineering and Consulting, Los Angeles, CA
Douglas G. Honegger
D.G. Honegger Consulting, Arroyo Grande, CA
Paper No:
IPC2008-64505, pp. 167-172; 6 pages
Published Online:
June 29, 2009
Citation
Keaton, JR, & Honegger, DG. "Geotechnical Challenges for Design of a Crude Oil Pipeline Across an Active Normal Fault in an Urban Area." Proceedings of the 2008 7th International Pipeline Conference. 2008 7th International Pipeline Conference, Volume 1. Calgary, Alberta, Canada. September 29–October 3, 2008. pp. 167-172. ASME. https://doi.org/10.1115/IPC2008-64505
Download citation file:
13
Views
Related Proceedings Papers
Related Articles
Cover Requirement and Stability of Horizontally Bent Buried Pipelines
J. Pressure Vessel Technol (April,2012)
Gas Coupled Ultrasonic Measurement of Pipeline Wall Thickness
J. Pressure Vessel Technol (August,2005)
Stability of Vertically Bent Pipelines Buried in Sand
J. Pressure Vessel Technol (August,2004)
Related Chapters
Better Risk Management for Underground Pipelines and Tunnels Using Sound Geotechnical Interpretation
Geological Engineering: Proceedings of the 1 st International Conference (ICGE 2007)
Pipeline Integrity and Security
Continuing and Changing Priorities of the ASME Boiler & Pressure Vessel Codes and Standards
Openings
Guidebook for the Design of ASME Section VIII Pressure Vessels