The lack of foresight by municipalities and others in preserving corridors for utilities means that there are increasingly fewer opportunities to locate linear facilities in large urban centers such as the City of Toronto. In those corridors that do exist, there are competing land uses that make it difficult to accommodate any new use. Many of these land uses are directly related to the people living adjacent to and in the vicinity of the corridors. In 2003, the Ontario Energy Board approved new “Environmental Guidelines for the Location, Construction and Operation of Hydrocarbon Pipelines and Facilities in Ontario”. The Guidelines include specific new requirements for planning pipelines in urban areas. Among other things, these new requirements involve the identification of indirectly affected landowners and a more detailed analysis of public issues and how they were resolved. Through the use of a case study, this paper identifies the public issues that were encountered in planning the location of a NPS 36 (Nominal Pipe Size 914 mm or 36 inch diameter) natural gas pipeline through residential neighbourhoods in the City of Toronto and the Town of Markham. It also describes how the public involvement requirements contained in the Ontario Energy Board’s new guidelines were incorporated into the planning process. The case study begins with a rationale for the study area selected. A description of the public issues follows. The techniques used to address these issues and the success of the public involvement program that identified 180 directly affected and 3,200 indirectly affected landowners is documented. The study results illustrate that it is possible to plan a right-of-way through an urban corridor in such a manner as to satisfy the general public, be compatible with existing development, conform to the new Ontario Energy Board Guidelines and minimize the amount of remedial work required to mitigate the impacts occurring on and adjacent to the right-of-way.
Skip Nav Destination
2004 International Pipeline Conference
October 4–8, 2004
Calgary, Alberta, Canada
Conference Sponsors:
- International Petroleum Technology Institute
ISBN:
0-7918-4176-6
PROCEEDINGS PAPER
Public Issues Associated With Planning a Large Diameter Pipeline in a Multi-Use Urban Corridor Available to Purchase
Mario E. Buszynski
Mario E. Buszynski
SENES Consultants Limited
Search for other works by this author on:
Mario E. Buszynski
SENES Consultants Limited
Paper No:
IPC2004-0142, pp. 533-538; 6 pages
Published Online:
December 4, 2008
Citation
Buszynski, ME. "Public Issues Associated With Planning a Large Diameter Pipeline in a Multi-Use Urban Corridor." Proceedings of the 2004 International Pipeline Conference. 2004 International Pipeline Conference, Volumes 1, 2, and 3. Calgary, Alberta, Canada. October 4–8, 2004. pp. 533-538. ASME. https://doi.org/10.1115/IPC2004-0142
Download citation file:
10
Views
Related Proceedings Papers
Related Articles
Gas Supply Reliability Analysis of a Natural Gas Pipeline System Considering the Effects of Demand Side Management
J. Pressure Vessel Technol (August,2021)
Developing Innovative Deep Water Pipeline Construction Techniques with Physical Models
J. Offshore Mech. Arct. Eng (February,2007)
Energy Usage in Natural Gas Pipeline Applications
J. Eng. Gas Turbines Power (February,2012)
Related Chapters
Better Risk Management for Underground Pipelines and Tunnels Using Sound Geotechnical Interpretation
Geological Engineering: Proceedings of the 1 st International Conference (ICGE 2007)
GUIDELINES FOR MANAGING GEOHAZARDS AFFECTING THE ENGINEERING AND CONSTRUCTION OF NEW OIL AND NATURAL GAS PIPELINES
Pipeline Integrity Management Under Geohazard Conditions (PIMG)
Pipeline Integrity and Security
Continuing and Changing Priorities of the ASME Boiler & Pressure Vessel Codes and Standards