Direct Assessment is allowed under the new Gas Pipeline Integrity Management Rules published by the Office of Pipeline Safety as an assessment method subject to specific applicability restrictions, direct examination criteria and restrictions to re-inspection intervals. The final developed costs for implementing direct assessment is largely dependent upon the extent of direct examination that in turn is a function of the pipeline condition and actual threats discovered and validated. Effective utilization of Direct Assessment within an Integrity Management Program is dependent upon the recognition of the value inherent in the Pre-Assessment Stage of the Direct Assessment Process as defined by the Rule, in which, threats are predicted, applicability confirmed and as a result of data and risk analysis, it is possible to estimate the condition of the pipeline to determine if the use of Direct Assessment is a practical consideration as well as permitted under the Gas Pipeline Integrity Management Rule.
Skip Nav Destination
2004 International Pipeline Conference
October 4–8, 2004
Calgary, Alberta, Canada
Conference Sponsors:
- International Petroleum Technology Institute
ISBN:
0-7918-4176-6
PROCEEDINGS PAPER
Pre-Assessment is Key to Success for Direct Assessment in Integrity Management Programs
Alberto Valdes
GE Energy
Richard McNealy
GE Energy
Paper No:
IPC2004-0176, pp. 1121-1125; 5 pages
Published Online:
December 4, 2008
Citation
Valdes, A, & McNealy, R. "Pre-Assessment is Key to Success for Direct Assessment in Integrity Management Programs." Proceedings of the 2004 International Pipeline Conference. 2004 International Pipeline Conference, Volumes 1, 2, and 3. Calgary, Alberta, Canada. October 4–8, 2004. pp. 1121-1125. ASME. https://doi.org/10.1115/IPC2004-0176
Download citation file:
10
Views
Related Proceedings Papers
Related Articles
Risk Analysis for the Urban Buried Gas Pipeline With Fuzzy Comprehensive Assessment Method
J. Pressure Vessel Technol (April,2012)
Risk Assessment Methodology for Electric-Current Induced Drowning Accidents
ASME J. Risk Uncertainty Part B (September,2016)
An Offshore Risk Analysis Method Using Fuzzy Bayesian Network
J. Offshore Mech. Arct. Eng (November,2009)
Related Chapters
Introduction
Computer Vision for Structural Dynamics and Health Monitoring
Integrity Technical Support
Pipeline Integrity Assurance: A Practical Approach
Engineering Concepts for Pipeline Integrity
Pipeline Integrity Management Systems: A Practical Approach