PETRONET undertook to evaluate the conversion of two liquid pipelines designed and constructed under ASME B31.4 to gas service under ASME B31.8. In a liquid pipeline, a rupture will result in small length of pipe (3 m–10 ft.) opening to release product and pressure. The same failure mechanism in a pipeline with gas service can be far more damaging. Under certain combinations of product, pressure, temperature and material, a rupture can result in a running fracture that can travel for miles. The releasing energy from the compressed gas can sustain the fracture mechanism until some barrier or material change can absorb the energy and allow the fracture to arrest. This can be the critical decision point in any planned service conversion. If the pipe material and operating conditions indicate that a running fracture may develop, then either the pipe has to be replaced or an arrest mechanism installed. The economics usually preclude pipe replacement so it becomes critical to develop a method of retrofitting suitable arrest units economically and safely. Clock Spring® Crack Arrestors have proven to be an economical solution to this challenge. This paper presents a case study of the conversion of a 457 mm (18-inch) pipeline, designed and constructed in accordance with ASME B31.4 for liquid service, to gas operation under ASME B31.8. The pipeline is located in South Africa and is operated by PETRONET. The use of Clock Spring® Crack Arrestors saved million dollars over pipe replacement and was a key issue in the economic justification of the conversion.
Skip Nav Destination
2002 4th International Pipeline Conference
September 29–October 3, 2002
Calgary, Alberta, Canada
Conference Sponsors:
- Pipeline Division
ISBN:
0-7918-3620-7
PROCEEDINGS PAPER
Retrofitting Crack Arrestors on a Pipeline Converted From Liquid to Gas Service
Patrick C. Porter,
Patrick C. Porter
Clock Spring Company L.P., Houston, TX
Search for other works by this author on:
Andrew J. Patrick
Andrew J. Patrick
Clock Spring Company L.P., UK
Search for other works by this author on:
Patrick C. Porter
Clock Spring Company L.P., Houston, TX
Andrew J. Patrick
Clock Spring Company L.P., UK
Paper No:
IPC2002-27011, pp. 205-210; 6 pages
Published Online:
February 24, 2009
Citation
Porter, PC, & Patrick, AJ. "Retrofitting Crack Arrestors on a Pipeline Converted From Liquid to Gas Service." Proceedings of the 2002 4th International Pipeline Conference. 4th International Pipeline Conference, Parts A and B. Calgary, Alberta, Canada. September 29–October 3, 2002. pp. 205-210. ASME. https://doi.org/10.1115/IPC2002-27011
Download citation file:
13
Views
Related Proceedings Papers
Related Articles
Measurement of Decompression Wave Speed in Rich Gas Mixtures at High Pressures (370 bars) Using a Specialized Rupture Tube
J. Pressure Vessel Technol (October,2010)
Failure of X52 Wrinkled Pipelines Subjected to Monotonic Axial Deformation
J. Pressure Vessel Technol (May,2008)
A Risk-Informed Approach to Leak-Before-Break Assessment of Pressure Tubes in CANDU Reactors
J. Pressure Vessel Technol (April,2010)
Related Chapters
Natural Gas Transmission
Pipeline Design & Construction: A Practical Approach, Third Edition
Pipeline Integrity and Security
Continuing and Changing Priorities of the ASME Boiler & Pressure Vessel Codes and Standards
Development of New Process and Product Monitoring Technologies for the Manufacturing of High Value Alloy Steels for Use in Critical Applications