This paper examines the conversion of a GE 7FA from generating 60 Cycle power to 50 Cycle power. The turbine is nominally rated for a 60-cycle ISO output of 175 MW. With the gas turbine boom of the late 1990s and then the cancellation of several GT based projects, a surplus of GTs has been created. Owners of these GTs have been reviewing alternative options for installation at another of their plants or resale of their GTs to another user. One potential solution is the conversion of a GT into a 50-cycle machine for installation in other markets around the world. If this type of conversion proves feasible, it also opens the door for the 60-cycle designed GTs to be marketed overseas to compete with original 50-cycle equipment. Three potential options for creating 50 Cycle power with a 7FA were identified: 1. Operate the Combustion Turbine Generator (CTG) at 3000 RPM to generate energy at 50 Hz. 2. Operate the CTG at 3600 RPM to generate energy at 60 Hz with the installation of an invertor, external to the CTG, to convert 60 Hz potential to 50 Hz. 3. Operate the turbine at 3600 RPM and the generator at 3000 RPM by installing a gearbox (speed reducer) between the turbine and the generator. These three options were researched and pricing was obtained on those that were considered feasible. The turbine OEM, GE, was also contacted to provide input on each of the scenarios. The results for each of the options are as follows.
Skip Nav Destination
International Joint Power Generation Conference collocated with TurboExpo 2003
June 16–19, 2003
Atlanta, Georgia, USA
Conference Sponsors:
- Power Division
ISBN:
0-7918-3692-4
PROCEEDINGS PAPER
Conversion of a GE 7FA From 60 Cycle to 50 Cycle Generation
Andrew W. Sutherland,
Andrew W. Sutherland
Cummins & Barnard, Ann Arbor, MI
Search for other works by this author on:
Samuel R. Barnes,
Samuel R. Barnes
Cummins & Barnard, Ann Arbor, MI
Search for other works by this author on:
William E. McCourtie
William E. McCourtie
Cummins & Barnard, Ann Arbor, MI
Search for other works by this author on:
Andrew W. Sutherland
Cummins & Barnard, Ann Arbor, MI
Samuel R. Barnes
Cummins & Barnard, Ann Arbor, MI
William E. McCourtie
Cummins & Barnard, Ann Arbor, MI
Paper No:
IJPGC2003-40202, pp. 649-653; 5 pages
Published Online:
December 17, 2008
Citation
Sutherland, AW, Barnes, SR, & McCourtie, WE. "Conversion of a GE 7FA From 60 Cycle to 50 Cycle Generation." Proceedings of the International Joint Power Generation Conference collocated with TurboExpo 2003. 2003 International Joint Power Generation Conference. Atlanta, Georgia, USA. June 16–19, 2003. pp. 649-653. ASME. https://doi.org/10.1115/IJPGC2003-40202
Download citation file:
6
Views
Related Proceedings Papers
Related Articles
Demonstration of a Palm-Sized 30 W Air-to-Power Turbine Generator
J. Eng. Gas Turbines Power (October,2011)
Comparative Study of Two Low C O 2 Emission Power Generation System Options With Natural Gas Reforming
J. Eng. Gas Turbines Power (September,2008)
Design Optimization of the Graz Cycle Prototype Plant
J. Eng. Gas Turbines Power (October,2004)
Related Chapters
Outlook
Closed-Cycle Gas Turbines: Operating Experience and Future Potential
Introduction
Consensus on Operating Practices for Control of Water and Steam Chemistry in Combined Cycle and Cogeneration
Combined Cycle Power Plant
Energy and Power Generation Handbook: Established and Emerging Technologies