Lincoln Electric System, the public power utility of Lincoln, Nebraska, will complete a multiple LM6000 gas turbine station project at the end of 2003 that features Selective Catalytic Reduction (SCR) for both combined cycle as well as simple cycle. Furthermore, the facility will be capable of meeting ultra low emissions levels of nitrogen oxides when firing both natural gas and Number 2 fuel oil. This discussion explores the selection and implementation of these emission control systems from procurement through first fire. Burns and McDonnell, of Kansas City, Missouri, led the design effort of this green field site and co-authors with members of the utility.