In the late 1990’s, two of the high-pressure feedwater heaters at PSEG Power LLC’s Mercer Generating Station began to experience tube leaks after almost 40 years of operation. Prior to the repair, these leaks were occurring at least once per month. Based on eddy current and video probe inspections, the area of tube degradation appeared to be isolated to the desuperheater region of the bundle. PSEG Power LLC performed a life assessment of the feedwater heaters and, based on the good condition of the remainder of the heaters, determined that repair of the desuperheater region could improve the reliability and significantly extend the operating life of the heat exchangers. The heater condition, coupled with a repair vs. replace economic model, led to the decision to sleeve the feedwater heaters. During the April 1999 maintenance outage, Framatome ANP performed repair work on the two high pressure feedwater heaters. This repair consisted of installing an 11 foot-2 inch (3404 mm) sleeve in all outlet tube ends, spanning the desuperheating region. The sleeving method used consisted of a three step process. After the sleeve was installed, its lower end was roll expanded within the tubesheet. Next, the entire length of the sleeve in the desuperheater section was expanded into close contact with the parent tube. The final installation step was upper hydraulic expansions, above the desuperheating zone end plate, in nondefective portions of the tube. This installed sleeve became the pressure boundary in the desuperheater section of the feedwater heater. After more than 4 years of operation, no tube leaks have been noted and the need to replace the components has been eliminated for the foreseeable future.
Skip Nav Destination
International Joint Power Generation Conference collocated with TurboExpo 2003
June 16–19, 2003
Atlanta, Georgia, USA
Conference Sponsors:
- Power Division
ISBN:
0-7918-3692-4
PROCEEDINGS PAPER
Four Years of Successful Operation at Mercer Generating Station Following Feedwater Heater Tube Repair: An Alternative to Replacement
Bruce W. Schafer,
Bruce W. Schafer
Framatome ANP, Lynchburg, VA
Search for other works by this author on:
Daniel B. Patten,
Daniel B. Patten
PSEG Power LLC, Newark, NJ
Search for other works by this author on:
Charles R. McCall
Charles R. McCall
PSEG Power LLC, Newark, NJ
Search for other works by this author on:
Bruce W. Schafer
Framatome ANP, Lynchburg, VA
Daniel B. Patten
PSEG Power LLC, Newark, NJ
Charles R. McCall
PSEG Power LLC, Newark, NJ
Paper No:
IJPGC2003-40067, pp. 61-69; 9 pages
Published Online:
December 17, 2008
Citation
Schafer, BW, Patten, DB, & McCall, CR. "Four Years of Successful Operation at Mercer Generating Station Following Feedwater Heater Tube Repair: An Alternative to Replacement." Proceedings of the International Joint Power Generation Conference collocated with TurboExpo 2003. 2003 International Joint Power Generation Conference. Atlanta, Georgia, USA. June 16–19, 2003. pp. 61-69. ASME. https://doi.org/10.1115/IJPGC2003-40067
Download citation file:
7
Views
Related Proceedings Papers
Related Articles
Pressure Testing Feedwater Heaters and Power Plant Auxiliary Heat Exchangers
J. Pressure Vessel Technol (October,2011)
Analysis of Failure Modes Resulting in Stress Corrosion Cracking of 304N Tubing in a High Pressure Heater Desuperheater
J. Eng. Gas Turbines Power (October,1998)
Detection and Sizing of Defects in Control Rod Drive Mechanism Penetrations Using Eddy Current and Ultrasonics
J. Pressure Vessel Technol (August,1996)
Related Chapters
Iwe and Iwl
Companion Guide to the ASME Boiler and Pressure Vessel Code, Volume 2, Fourth Edition
IWE and IWL
Companion Guide to the ASME Boiler and Pressure Vessel Codes, Volume 2, Fifth Edition
Section XI: Rules for Inservice Inspection and Tests of Nuclear Power Plant Components
Online Companion Guide to the ASME Boiler & Pressure Vessel Codes