Bulk of CO2 emission comes from thermal power generation, which constitutes about 63% of total installed capacity of around 101.6 GWe. The policy makers and power utilities are increasingly favoring the introduction of clean coal technologies, which release less pollutants viz. CO2, NOx and SOx than the conventional thermal plants and have potential to operate at higher efficiencies above 42–44%. Among the clean coal technologies, Integrated Gasification Combined Cycle (IGCC) is being considered the most promising because of higher thermal efficiencies and improved environmental performance. IGCC has the added advantage of removing sulphur pollutants in bed using sorbent as against expensive external post combustion flue gas desulphurisation systems. It is proposed to set up 100MWe-demonstration plant for proving the emission standards and performance prior to commercialization. This plant is based on Frame 6 FA gas turbine designed for low Btu gas firing. The Paper presents the technical parameters and compares the overall project cost of 100MWe IGCC plant for both Cold gas cleanup unit (CGCU) and Hot gas cleanup unit (HGCU), which comprises of Gasification Island, power block, and balance of plant. Being first of kind the project cost is higher and the project cost is likely to get reduced for utility scale of 425 MW IGCC plants in future.
Skip Nav Destination
International Joint Power Generation Conference collocated with TurboExpo 2003
June 16–19, 2003
Atlanta, Georgia, USA
Conference Sponsors:
- Power Division
ISBN:
0-7918-3692-4
PROCEEDINGS PAPER
A Technoeconomic Comparison of IGCC Power Plants With Cold Gas Cleanup and Hot Gas Cleanup Units Using Indian Coals
J. S. Rao,
J. S. Rao
D.G.M./Systems Corporation, Hyderabad, India
Search for other works by this author on:
J. Neelima,
J. Neelima
M.V.S.R. Engineering College, Hyderabad, India
Search for other works by this author on:
G. Srikanth
G. Srikanth
Vasavi College of Engineering, Hyderabad, India
Search for other works by this author on:
J. S. Rao
D.G.M./Systems Corporation, Hyderabad, India
J. Neelima
M.V.S.R. Engineering College, Hyderabad, India
G. Srikanth
Vasavi College of Engineering, Hyderabad, India
Paper No:
IJPGC2003-40018, pp. 379-387; 9 pages
Published Online:
December 17, 2008
Citation
Rao, JS, Neelima, J, & Srikanth, G. "A Technoeconomic Comparison of IGCC Power Plants With Cold Gas Cleanup and Hot Gas Cleanup Units Using Indian Coals." Proceedings of the International Joint Power Generation Conference collocated with TurboExpo 2003. 2003 International Joint Power Generation Conference. Atlanta, Georgia, USA. June 16–19, 2003. pp. 379-387. ASME. https://doi.org/10.1115/IJPGC2003-40018
Download citation file:
7
Views
Related Proceedings Papers
Related Articles
In-Furnace Sulfur Capture by Cofiring Coal With Alkali-Based Sorbents
J. Energy Resour. Technol (July,2017)
System Evaluation and LBTU Fuel Combustion Studies for IGCC Power Generation
J. Eng. Gas Turbines Power (October,1995)
Effect of Pressure on Combustion Characteristics in LBG-Fueled 1300°C-Class Gas Turbine
J. Eng. Gas Turbines Power (July,1994)
Related Chapters
Combined Cycle Power Plant
Energy and Power Generation Handbook: Established and Emerging Technologies
Introduction
Consensus on Operating Practices for Control of Water and Steam Chemistry in Combined Cycle and Cogeneration
Conclusions
Clean and Efficient Coal-Fired Power Plants: Development Toward Advanced Technologies