In the year 2000 one of Europe’s most flexible power stations was commissioned by the authors’ company. The existing fossil fired power station was modified by a “Parallel Repowering”. With that concept three gas turbines (GT) in combination with three heat recovery steam generators (HRSG) were tied-in additionally to the fired boiler. This concept is compelling especially for large steam power plants and offers more flexibility than “Full Repowering” in matching GTs with the existing steam turbine (ST). The key to maintaining reliability of the repowered unit is the ST modernisation. Plant operability enhancements provide the flexibility of the fired boiler and ST for load following and peaking purposes. The authors’ company was responsible for the complete conversion of the fossil fired power station into a modern combined cycle unit. This comprises the tie-in of new steam pipes, bypass stations and the upgrade of the steam turbine auxiliaries as well as the implementation of a new automation system parallel to the existing one. The “Parallel Repowering” offers a maximum of operation variations: •Conventional (Rakine cycle) mode. •Open cycle mode (only GT). •Combined cycle mode. •Hybrid mode. The non-OEM steam turbine needed to be modified for the combined cycle operation with GTs. The condenser load had to be kept as low as possible because of the existing condenser design. Auxiliary systems like the gland steam system and the drain system had to be modified for all different operating modes. Special design features, like the IP rotor cooling system and the flange heating system, had to be extended to operate under all circumstances. One essential difference to the existing operational mode is the necessity of a steam bypass operation. Existing cold reheat (CRH) piping is of carbon steel, so the ST needs to be started with an isolated HP cylinder. The following modifications for the HP turbine were necessary: •For the isolated HP cylinder operation non-return valves (NRV) were built into the CRH line at the HP turbine exhaust. •The HP cylinder will be automatically isolated by closure of the HP valves and the non-return valves in the CRH line, and the simultaneous opening of the HP vent line. •As no instrumentation was available for a reliable monitoring of the isolated operation, a controlled reverse flow from the CRH to the HP vent line was established. •The HP cylinder evacuation is controlled by a dedicated control logic.
Skip Nav Destination
2002 International Joint Power Generation Conference
June 24–26, 2002
Scottsdale, Arizona, USA
Conference Sponsors:
- Power Division
ISBN:
0-7918-3617-7
PROCEEDINGS PAPER
Peterhead Power Station: Parallel Repowering Innovative Steam Turbine Enhancement
Thomas Depolt,
Thomas Depolt
Siemens Power Generation, Mu¨lheim, Germany
Search for other works by this author on:
Edwin Gobrecht,
Edwin Gobrecht
Siemens Power Generation, Mu¨lheim, Germany
Search for other works by this author on:
Gu¨nter Musch
Gu¨nter Musch
Siemens Power Generation, Mu¨lheim, Germany
Search for other works by this author on:
Thomas Depolt
Siemens Power Generation, Mu¨lheim, Germany
Edwin Gobrecht
Siemens Power Generation, Mu¨lheim, Germany
Gu¨nter Musch
Siemens Power Generation, Mu¨lheim, Germany
Paper No:
IJPGC2002-26016, pp. 425-432; 8 pages
Published Online:
February 24, 2009
Citation
Depolt, T, Gobrecht, E, & Musch, G. "Peterhead Power Station: Parallel Repowering Innovative Steam Turbine Enhancement." Proceedings of the 2002 International Joint Power Generation Conference. 2002 International Joint Power Generation Conference. Scottsdale, Arizona, USA. June 24–26, 2002. pp. 425-432. ASME. https://doi.org/10.1115/IJPGC2002-26016
Download citation file:
7
Views
Related Proceedings Papers
Related Articles
Start-Up Optimization of a CCGT Power Station Using Model-Based Gas Turbine Control
J. Eng. Gas Turbines Power (April,2019)
A Computational Model of a Combined Cycle Power Generation Unit
J. Energy Resour. Technol (September,2004)
Last Stage Performance Considerations in Low-Pressure Turbines of Power Plants: A Case Study
J. Eng. Gas Turbines Power (March,2008)
Related Chapters
Combined Cycle Power Plant
Energy and Power Generation Handbook: Established and Emerging Technologies
Lay-Up and Start-Up Practices
Consensus on Operating Practices for Control of Water and Steam Chemistry in Combined Cycle and Cogeneration
Introduction
Consensus on Operating Practices for Control of Water and Steam Chemistry in Combined Cycle and Cogeneration