The National Fire Protection Association’s “NFPA 85 Boiler and Combustion Systems Hazards Code 2001 Edition” currently requires an independent logic solver for each burner management system. This requirement can result in high costs when providing burner management systems for multiple boiler applications. Current logic system technology provides dual and triplicated redundant logic solvers with the capability to reliably perform emergency shutdown functions for multiple equipment. This paper presents a hypothetical study that will quantitatively show the high level of availability and reliability that could be achieved employing a redundant logic system in multiple boiler applications. Common cause failure considerations will also be addressed.
Skip Nav Destination
2002 International Joint Power Generation Conference
June 24–26, 2002
Scottsdale, Arizona, USA
Conference Sponsors:
- Power Division
ISBN:
0-7918-3617-7
PROCEEDINGS PAPER
Shared BMS Logic Systems in Boiler Applications: A Hypothetical Study Available to Purchase
Glenn A. Raney
Glenn A. Raney
Premier Consulting Services, Webster, TX
Search for other works by this author on:
Glenn A. Raney
Premier Consulting Services, Webster, TX
Paper No:
IJPGC2002-26180, pp. 397-402; 6 pages
Published Online:
February 24, 2009
Citation
Raney, GA. "Shared BMS Logic Systems in Boiler Applications: A Hypothetical Study." Proceedings of the 2002 International Joint Power Generation Conference. 2002 International Joint Power Generation Conference. Scottsdale, Arizona, USA. June 24–26, 2002. pp. 397-402. ASME. https://doi.org/10.1115/IJPGC2002-26180
Download citation file:
9
Views
Related Proceedings Papers
Related Articles
Two-Zone Proportional Hazard Model for Equipment Remaining Useful Life Prediction
J. Manuf. Sci. Eng (August,2010)
External Hazard Coinciding With Small Break LOCA—Thermohydraulic Calculation With System Code ATHLET
ASME J of Nuclear Rad Sci (April,2020)
Techno-Economic Impact Assessments of Energy Efficiency Improvements in the Industrial Combustion Systems
J. Energy Resour. Technol (August,2022)
Related Chapters
A PSA Update to Reflect Procedural Changes (PSAM-0217)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)
Reasons for Lay-Up
Consensus for the Lay-up of Boilers, Turbines, Turbine Condensors, and Auxiliary Equipment (CRTD-66)
Improvement of JEM Operation by PSA (PSAM-0139)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)