A kaizen event is used to eliminate wastes in a task, typically through the application of lean tools. However, there exist no methods to insure that the most effective process improvements are done first. Given limited resources, the improvement of which of the tasks within a process would deliver the maximum benefit (maximum value added)? The value-based improvement prioritization tool addresses this question, using value stream mapping and an adapted application relative worth analysis (process relative worth analysis) as a basis to help generate a prioritization scheme for deciding what type of improvement action is to be taken for which tasks. To adapt relative worth analysis for use in manufacturing, the parameters of cost, quality, and delivery are used as measures of customer value. The result is metrics for percent relative cost and worth for each of the three parameters as well as for a singular combination of the three parameters, process net value. It is important that all of these measures rely on information available within a value stream map. Through an example application, the well known ACME stamping example from Rother and Shook’s Learning to See, we clarify the application of the tool to a manufacturing process. The result is a description of which tasks in the process are most in need of improvement and what the focus of that improvement should be. The user of the value-based improvement tool can prioritize each process task with respect to the three parameters to see which tasks are in need of improvement. Not only does the process relative worth analysis yield task priorities, but it also indicates which parameter to improve it upon and whether the task improvement should be focused on reducing cost or increasing worth.
Skip Nav Destination
ASME 2006 International Design Engineering Technical Conferences and Computers and Information in Engineering Conference
September 10–13, 2006
Philadelphia, Pennsylvania, USA
Conference Sponsors:
- Design Engineering Division and Computers and Information in Engineering Division
ISBN:
0-7918-4258-4
PROCEEDINGS PAPER
Value-Based Improvement Prioritization Using Process Relative Worth Analysis
Nikhil Sanyal,
Nikhil Sanyal
Michigan Technological University, Houghton, MI
Search for other works by this author on:
John K. Gershenson
John K. Gershenson
Michigan Technological University, Houghton, MI
Search for other works by this author on:
Nikhil Sanyal
Michigan Technological University, Houghton, MI
John K. Gershenson
Michigan Technological University, Houghton, MI
Paper No:
DETC2006-99531, pp. 605-613; 9 pages
Published Online:
June 3, 2008
Citation
Sanyal, N, & Gershenson, JK. "Value-Based Improvement Prioritization Using Process Relative Worth Analysis." Proceedings of the ASME 2006 International Design Engineering Technical Conferences and Computers and Information in Engineering Conference. Volume 4b: 11th Design for Manufacturing and the Lifecycle Conference. Philadelphia, Pennsylvania, USA. September 10–13, 2006. pp. 605-613. ASME. https://doi.org/10.1115/DETC2006-99531
Download citation file:
3
Views
0
Citations
Related Proceedings Papers
A Stamp-Sealed Microshell Package for RF MEMS Switches
InterPACK2007
Related Articles
Design and Testing of a Thin-Flexure Bistable Mechanism Suitable for Stamping From Metal Sheets
J. Mech. Des (July,2010)
Experimental Primer Seating-Stamping Tool Study in Small Caliber Cartridge Production
J. Manuf. Sci. Eng (December,2011)
Advances in Sheet Forming—Materials Modeling, Numerical Simulation, and Press Technologies
J. Manuf. Sci. Eng (December,2011)
Related Chapters
Certification by Data Reports and Stamping
Power Boilers: A Guide to the Section I of the ASME Boiler and Pressure Vessel Code, Second Edition
Subsection NC, ND—Class 2 and 3 Components
Companion Guide to the ASME Boiler & Pressure Vessel Code, Volume 1, Second Edition
Subsection NE—Class MC Components
Companion Guide to the ASME Boiler & Pressure Vessel Code, Volume 1, Second Edition