Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- ISBN-10
- ISSN
- EISSN
- Issue
- Journal Volume Number
- References
- Conference Volume Title
- Paper No
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- ISBN-10
- ISSN
- EISSN
- Issue
- Journal Volume Number
- References
- Conference Volume Title
- Paper No
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- ISBN-10
- ISSN
- EISSN
- Issue
- Journal Volume Number
- References
- Conference Volume Title
- Paper No
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- ISBN-10
- ISSN
- EISSN
- Issue
- Journal Volume Number
- References
- Conference Volume Title
- Paper No
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- ISBN-10
- ISSN
- EISSN
- Issue
- Journal Volume Number
- References
- Conference Volume Title
- Paper No
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- ISBN-10
- ISSN
- EISSN
- Issue
- Journal Volume Number
- References
- Conference Volume Title
- Paper No
NARROW
Format
Article Type
Subject Area
Topics
Date
Availability
1-16 of 16
Keywords: risk-informed
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Assessment of Emergency Planning Zone for Small Modular Pressurized Water Reactors Based on the Risk-Informed Methodology
Available to Purchase
Proc. ASME. ICONE31, Volume 4: SMRs, Advanced Reactors, and Fusion, V004T04A033, August 4–8, 2024
Publisher: American Society of Mechanical Engineers
Paper No: ICONE31-134526
... of small reactors has become a focus in the nuclear industry. Based on the risk-informed methodology recommended by IAEA-TECDOC-1652, considering both the frequency of the entire spectrum of accident scenarios and the dose consequence for each scenario, this paper analyzes and calculates the EPZ size...
Proceedings Papers
Risk-Informed Defense-in-Depth Strategy for Nuclear Power Plant
Available to Purchase
Proc. ASME. ICONE31, Volume 10: Risk Assessments and Management; Computer Code Verification and Validation; Nuclear Education and Public Acceptance, V010T12A016, August 4–8, 2024
Publisher: American Society of Mechanical Engineers
Paper No: ICONE31-135793
... to develop a more comprehensive, holistic, and technology-inclusive DID strategy is explored in this study. A risk-informed (RI) method is adopted to improve the DID strategy by combining the traditional DID concept with a risk-informed approach. Considering the gradual development of risk assessment methods...
Proceedings Papers
Pilot Application of RISMC Methodology on Specific SBLOCA Sequences of Passive NPP
Available to Purchase
Proc. ASME. ICONE29, Volume 13: Risk Assessments and Management, V013T13A032, August 8–12, 2022
Publisher: American Society of Mechanical Engineers
Paper No: ICONE29-92128
... that the method can remove unnecessary conservatism. more realistic assessment of the risk helps us quantify the safety margin of nuclear power plants better. Keywords: Risk-informed, Passive NPP, SBLOCA, Risk evaluate Sponsored by National key R&D Program of China2018YFB1900303. 1. INTRODUCTION Risk Informed...
Proceedings Papers
Research on Optimization Method of Risk-Informed In-Service Inspection Strategy of RCP-RRA Connection Inlet Valve in Nuclear Power Plant
Available to Purchase
Proc. ASME. ICONE29, Volume 13: Risk Assessments and Management, V013T13A045, August 8–12, 2022
Publisher: American Society of Mechanical Engineers
Paper No: ICONE29-93142
...Proceedings of the 2022 29th International Conference on Nuclear Engineering ICONE29 August 8-12, 2022, Virtual, Online ICONE29-93142 RESEARCH ON OPTIMIZATION METHOD OF RISK-INFORMED IN-SERVICE INSPECTION STRATEGY OF RCP-RRA CONNECTION INLET VALVE IN NUCLEAR POWER PLANT Li-hui CHEN Suzhou Nuclear...
Proceedings Papers
Application of Risk-Informed Approach in Emergency Compressor Emergency Backup Function Test
Available to Purchase
Proc. ASME. ICONE29, Volume 13: Risk Assessments and Management, V013T13A018, August 8–12, 2022
Publisher: American Society of Mechanical Engineers
Paper No: ICONE29-91480
... test test period extension SAP PSA risk-informed Proceedings of the 2022 29th International Conference on Nuclear Engineering ICONE29 August 8-12, 2022, Virtual, Online ICONE29-91480 APPLICATION OF RISK-INFORMED APPROACH IN EMERGENCY COMPRESSOR EMERGENCY BACKUP FUNCTION TEST Deyi Liu CNNC...
Proceedings Papers
Practice of Risk-Informed Nuclear Safety Management in CGN
Available to Purchase
Proc. ASME. ICONE29, Volume 13: Risk Assessments and Management, V013T13A059, August 8–12, 2022
Publisher: American Society of Mechanical Engineers
Paper No: ICONE29-93663
... the implementation of advanced nuclear safety management methods at the group level and proposes the direction for further development. risk-informed nuclear safety management regulatory framework application practice Proceedings of the 2022 29th International Conference on Nuclear Engineering ICONE29...
Proceedings Papers
The Application of Risk-Informed Management Index in NPPs Risk Management
Available to Purchase
Proc. ASME. ICONE29, Volume 13: Risk Assessments and Management, V013T13A058, August 8–12, 2022
Publisher: American Society of Mechanical Engineers
Paper No: ICONE29-93639
... Abstract With domestic NPP units increased, it is urgent to establish a more reasonable regulation way with full emphasis on plant significant items. This paper, based on the deterministic methodology and engineering judge, researches the risk-informed management index by applying SDP...
Proceedings Papers
Periodic Test Period Extension for Partial Closing of Main Steam Isolation Valve
Available to Purchase
Proc. ASME. ICONE28, Volume 3: Computational Fluid Dynamics (CFD); Verification and Validation; Advanced Methods of Manufacturing (AMM) for Nuclear Reactors and Components; Decontamination, Decommissioning, and Radioactive Waste Management; Beyond Design Basis and Nuclear Safety; Risk Informed Management and Regulation, V003T13A003, August 4–6, 2021
Publisher: American Society of Mechanical Engineers
Paper No: ICONE28-64413
... of nuclear power plants. PSA has gradually developed into an important tool for safety evaluation and decision making. With the development and improvement of PSA technology, risk-informed safety management has been widely used. The this paper, the use of risk-informed PSA method to demonstrate the extension...
Proceedings Papers
Use PSA Methodology to Evaluate Baseline Risk Index for Initiating Events in Daya Bay NPP
Available to Purchase
Proc. ASME. ICONE18, 18th International Conference on Nuclear Engineering: Volume 3, 461-466, May 17–21, 2010
Publisher: American Society of Mechanical Engineers
Paper No: ICONE18-29483
... 08 04 2011 Baseline Risk Index for Initiating Events (BRIIE) is an integrated industry-level initiating event performance indicator that is risk informed. BRIIE is a performance indicator that provides a mechanism for determining the risk significance of changes in performance, at both...
Proceedings Papers
On the Use of Binary Importance Decision for Risk-Informed Categorization of SSCs
Available to Purchase
Proc. ASME. ICONE17, Volume 2: Structural Integrity; Safety and Security; Advanced Applications of Nuclear Technology; Balance of Plant for Nuclear Applications, 323-329, July 12–16, 2009
Publisher: American Society of Mechanical Engineers
Paper No: ICONE17-75071
... requirements for the nonsafety-related components are too loose. In order to make the requirements reasonable, the risk-informed significance categorization of SSCs has been presented. Risk-informed significance categorization (RISC) is to categorize structures, systems, or components (SSCs) of a nuclear power...
Topics:
Risk
Proceedings Papers
Developments on Implementation of WOG Risk-Informed Inservice Inspection Methodology
Available to PurchaseCheryl L. Boggess, John F. Kolonay, Luis Ulloa Allones, Kenneth R. Balkey, Anthony Billington, Bruce A. Bishop, Richard L. Haessler, Paul R. Stevenson
Proc. ASME. ICONE10, 10th International Conference on Nuclear Engineering, Volume 4, 639-648, April 14–18, 2002
Publisher: American Society of Mechanical Engineers
Paper No: ICONE10-22732
... Inspection Piping Risk-Informed WOG The Westinghouse Owners Group (WOG) risk-informed inservice inspection (ISI) methodology has been in use for over three years as an alternative to current regulatory requirements in the development and implementation of ISI programs for nuclear plant...
Proceedings Papers
Developments on ASME Code Cases to Risk-Inform Repair/Replacement Activities in Support of Risk-Informed Regulation Initiatives
Available to Purchase
Proc. ASME. ICONE10, 10th International Conference on Nuclear Engineering, Volume 4, 649-660, April 14–18, 2002
Publisher: American Society of Mechanical Engineers
Paper No: ICONE10-22733
... ASME Repair Replacement Risk-Informed Structures Systems Components ASME Code Case N-658, “Risk-Informed Safety Classification for Use in Risk-Informed Repair/Replacement Activities” and Code Case N-660, “Alternative Repair/Replacement Requirements For Items Classified In Accordance...
Proceedings Papers
Using RIAM for Optimizing Reactor Vessel Head Leak Failure Mode Maintenance Strategies
Available to Purchase
Proc. ASME. ICONE12, 12th International Conference on Nuclear Engineering, Volume 2, 143-148, April 25–29, 2004
Publisher: American Society of Mechanical Engineers
Paper No: ICONE12-49376
...-Groove CRDM nozzle leak boundary risk risk-informed asset management 12th International Conference on Nuclear Engineering: Nuclear Energy - Powering the Future Proceedings of ICONE12 12th International Conference on Nuclear Engineering April 25-29, 2004, Arlington, Virginia USA 1 Copyright ©...
Proceedings Papers
Risk-Informed Pressurized Water Reactor Vessel Inspection Interval Extension
Available to Purchase
Proc. ASME. ICONE12, 12th International Conference on Nuclear Engineering, Volume 2, 633-641, April 25–29, 2004
Publisher: American Society of Mechanical Engineers
Paper No: ICONE12-49429
... 25 11 2008 The methodology discussed in this paper provides a risk informed basis for decreasing the frequency of inspection for the Pressurized Water Reactor (PWR) reactor pressure vessel (RPV). The decrease in frequency is based on extending the interval between inspections from...
Proceedings Papers
Update to Risk-Informed Pressurized Water Reactor Vessel 10 to 20 Year Inspection Interval Extension
Available to Purchase
Proc. ASME. ICONE14, Volume 1: Plant Operations, Maintenance and Life Cycle; Component Reliability and Materials Issues; Codes, Standards, Licensing and Regulatory Issues; Fuel Cycle and High Level Waste Management, 735-744, July 17–20, 2006
Publisher: American Society of Mechanical Engineers
Paper No: ICONE14-89470
... presented a risk informed basis for extending the interval between inspections from the current interval of 10 years to 20 years. In the paper presented at ICONE-12, results of pilot studies on typical Westinghouse and Combustion Engineering Nuclear Steam Supply System (NSSS) designs of PWR vessels showed...
Proceedings Papers
Lessons Learned From Implementation of Westinghouse Owners Group Risk-Informed Inservice Inspection Methodology for Piping
Available to Purchase
Proc. ASME. ICONE14, Volume 1: Plant Operations, Maintenance and Life Cycle; Component Reliability and Materials Issues; Codes, Standards, Licensing and Regulatory Issues; Fuel Cycle and High Level Waste Management, 783-790, July 17–20, 2006
Publisher: American Society of Mechanical Engineers
Paper No: ICONE14-89740
... 17 09 2008 Risk-informed inservice inspection (ISI) programs have been in use for over seven years as an alternative to current regulatory requirements in the development and implementation of ISI programs for nuclear plant piping systems. Programs using the Westinghouse Owners Group...