1-2 of 2
Keywords: permitting
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Proc. ASME. ICONE18, 18th International Conference on Nuclear Engineering: Volume 6, 403-407, May 17–21, 2010
Publisher: American Society of Mechanical Engineers
Paper No: ICONE18-29331
... power plants. Potential environmental and safety concerns must be carefully evaluated and addressed. In order to assure that the nuclear power plant designs are sufficiently robust, the U.S. Nuclear Regulatory Commission (USNRC) requires that applicants for early site permits (ESP) and construction...
Proceedings Papers

Proc. ASME. ICONE17, Volume 4: Codes, Standards, Licensing and Regulatory Issues; Student Paper Competition, 39-48, July 12–16, 2009
Publisher: American Society of Mechanical Engineers
Paper No: ICONE17-75111
... in preparing a Combined License Permit Application (COLA) in the United States. Additionally, the differences in methodology for determination of these meteorological conditions by reactor type (i.e., Advanced Passive 1000–AP1000, Advanced Boiling Water Reactor–ABWR, Economic Simplified Boiling Water Reactor...