1-20 of 54
Radioactivity
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
×Close Modal
Sort by
Proceedings Papers

Proc. ASME. ICONE26, Volume 3: Nuclear Fuel and Material, Reactor Physics, and Transport Theory, V003T02A046, July 22–26, 2018
Paper No: ICONE26-82242
Proceedings Papers

Proc. ASME. ICONE26, Volume 2: Plant Systems, Structures, Components, and Materials; Risk Assessments and Management, V002T03A007, July 22–26, 2018
Paper No: ICONE26-81232
Proceedings Papers

Proc. ASME. ICONE26, Volume 7: Decontamination and Decommissioning, Radiation Protection, and Waste Management; Mitigation Strategies for Beyond Design Basis Events, V007T10A016, July 22–26, 2018
Paper No: ICONE26-81941
Proceedings Papers

Proc. ASME. ICONE26, Volume 7: Decontamination and Decommissioning, Radiation Protection, and Waste Management; Mitigation Strategies for Beyond Design Basis Events, V007T10A017, July 22–26, 2018
Paper No: ICONE26-82026
Proceedings Papers

Proc. ASME. ICONE26, Volume 7: Decontamination and Decommissioning, Radiation Protection, and Waste Management; Mitigation Strategies for Beyond Design Basis Events, V007T10A006, July 22–26, 2018
Paper No: ICONE26-81338
Proceedings Papers

Proc. ASME. ICONE26, Volume 7: Decontamination and Decommissioning, Radiation Protection, and Waste Management; Mitigation Strategies for Beyond Design Basis Events, V007T10A019, July 22–26, 2018
Paper No: ICONE26-82056
Proceedings Papers

Proc. ASME. ICONE26, Volume 4: Nuclear Safety, Security, and Cyber Security; Computer Code Verification and Validation, V004T06A001, July 22–26, 2018
Paper No: ICONE26-81067
Proceedings Papers

Proc. ASME. ICONE26, Volume 4: Nuclear Safety, Security, and Cyber Security; Computer Code Verification and Validation, V004T06A009, July 22–26, 2018
Paper No: ICONE26-81269
Proceedings Papers

Proc. ASME. ICONE26, Volume 4: Nuclear Safety, Security, and Cyber Security; Computer Code Verification and Validation, V004T06A040, July 22–26, 2018
Paper No: ICONE26-82327
Proceedings Papers

Proc. ASME. ICONE26, Volume 4: Nuclear Safety, Security, and Cyber Security; Computer Code Verification and Validation, V004T06A019, July 22–26, 2018
Paper No: ICONE26-81520
Proceedings Papers

Proc. ASME. ICONE26, Volume 8: Computational Fluid Dynamics (CFD); Nuclear Education and Public Acceptance, V008T09A033, July 22–26, 2018
Paper No: ICONE26-82088
Proceedings Papers

Proc. ASME. ICONE26, Volume 1: Operations and Maintenance, Engineering, Modifications, Life Extension, Life Cycle, and Balance of Plant; Instrumentation and Control (I&C) and Influence of Human Factors; Innovative Nuclear Power Plant Design and SMRs, V001T13A007, July 22–26, 2018
Paper No: ICONE26-81311
Proceedings Papers

Proc. ASME. ICONE25, Volume 4: Nuclear Safety, Security, Non-Proliferation and Cyber Security; Risk Management, V004T06A011, July 2–6, 2017
Paper No: ICONE25-66367
Proceedings Papers

Proc. ASME. ICONE25, Volume 4: Nuclear Safety, Security, Non-Proliferation and Cyber Security; Risk Management, V004T14A031, July 2–6, 2017
Paper No: ICONE25-66979
Proceedings Papers

Proc. ASME. ICONE25, Volume 4: Nuclear Safety, Security, Non-Proliferation and Cyber Security; Risk Management, V004T14A041, July 2–6, 2017
Paper No: ICONE25-67867
Proceedings Papers

Proc. ASME. ICONE25, Volume 8: Computational Fluid Dynamics (CFD) and Coupled Codes; Nuclear Education, Public Acceptance and Related Issues, V008T12A001, July 2–6, 2017
Paper No: ICONE25-66020
Proceedings Papers

Proc. ASME. ICONE25, Volume 9: Student Paper Competition, V009T15A040, July 2–6, 2017
Paper No: ICONE25-67252
Proceedings Papers

Proc. ASME. ICONE25, Volume 7: Fuel Cycle, Decontamination and Decommissioning, Radiation Protection, Shielding, and Waste Management; Mitigation Strategies for Beyond Design Basis Events, V007T10A020, July 2–6, 2017
Paper No: ICONE25-67007
Proceedings Papers

Proc. ASME. ICONE25, Volume 7: Fuel Cycle, Decontamination and Decommissioning, Radiation Protection, Shielding, and Waste Management; Mitigation Strategies for Beyond Design Basis Events, V007T11A021, July 2–6, 2017
Paper No: ICONE25-67598
Proceedings Papers

Proc. ASME. ICONE24, Volume 3: Thermal-Hydraulics, V003T09A077, June 26–30, 2016
Paper No: ICONE24-61007