Elimination of soluble boron will be a challenge to reactor operation for PWR. This paper is to promote a control strategy of soluble boron-free operation for a small PWR, through selection of burnable poison (BP), BP loading and control rod loading, based on the reactivity balance and manage requirement. The analysis for on-power operation and shutdown condition indicated that this strategy could be suitable for long-term and short-term reactivity and power distribution control for soluble boron-free operation.
Volume Subject Area:
Innovative Nuclear Power Plant Design and New Technology Application
This content is only available via PDF.
Copyright © 2017 by ASME
You do not currently have access to this content.