This paper presents a new reliability assessment method for complex nuclear power equipment based on Goal Oriented (GO) method to evaluate Mean Time To Failures (MTTF). First, the new reliability assessment method is expounded in detail. And its process is formulated. Then, the electronic control system of hoisting mechanism in nuclear power plant is taken as an example to evaluate its MTTF by the new method. The reliability assessment processes are mainly as follows: (i) Conducting system analysis, (ii) Developing GO model, (iii) Selecting test unit by qualitative analysis of GO method, (iv) Collecting test data, (v) Estimating the failure rate of test unit, (vi) Evaluating system MTTF. In order to verify the advantages and rationality of the new reliability assessment method, the results are compared with the results by Monte Carlo method. All in all, this reliability assessment method not only improves the theory of GO method, which is only used to conduct reliability analysis before; but also provides a new approach for reliability assessment of complex nuclear power equipment, so than it can reduces costs, and improve estimating efficiency and accuracy.
Skip Nav Destination
2017 25th International Conference on Nuclear Engineering
July 2–6, 2017
Shanghai, China
Conference Sponsors:
- Nuclear Engineering Division
ISBN:
978-0-7918-5779-3
PROCEEDINGS PAPER
A New Reliability Assessment Method for Complex Nuclear Power Equipment Based on Goal Oriented Methodology Available to Purchase
Yi Xiao-jian,
Yi Xiao-jian
Beijing Institute of Technology, Beijing, China
Search for other works by this author on:
Lu Ming-chao,
Lu Ming-chao
Shanghai Nuclear Engineering Research & Design Institute, Shanghai, China
Search for other works by this author on:
Mu Hui-na,
Mu Hui-na
Beijing Institute of Technology, Beijing, China
Search for other works by this author on:
Shi Jian,
Shi Jian
Chinese Academy of Sciences, Beijing, China
Search for other works by this author on:
Hou Peng
Hou Peng
Beijing Institute of Technology, Beijing, China
Search for other works by this author on:
Yi Xiao-jian
Beijing Institute of Technology, Beijing, China
Lu Ming-chao
Shanghai Nuclear Engineering Research & Design Institute, Shanghai, China
Mu Hui-na
Beijing Institute of Technology, Beijing, China
Shi Jian
Chinese Academy of Sciences, Beijing, China
Hou Peng
Beijing Institute of Technology, Beijing, China
Paper No:
ICONE25-67546, V001T01A040; 8 pages
Published Online:
October 17, 2017
Citation
Xiao-jian, Y, Ming-chao, L, Hui-na, M, Jian, S, & Peng, H. "A New Reliability Assessment Method for Complex Nuclear Power Equipment Based on Goal Oriented Methodology." Proceedings of the 2017 25th International Conference on Nuclear Engineering. Shanghai, China. July 2–6, 2017. V001T01A040. ASME. https://doi.org/10.1115/ICONE25-67546
Download citation file:
21
Views
Related Proceedings Papers
Related Articles
Markov/CCMT Dynamic Reliability Analysis of the Main and Startup Feedwater Control System in Nuclear Power Plant
ASME J of Nuclear Rad Sci (October,2018)
Reliability-Based Optimization With Discrete and Continuous Decision and Random Variables
J. Mech. Des (June,2008)
An Indicator Response Surface Method for Simulation-Based Reliability Analysis
J. Mech. Des (July,2008)
Related Chapters
SAPHIRE — Past, Present and Future (PSAM-0279)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)
Integrity Management of Critical Systems Introduction
Asset Integrity Management of Critical Infrastructure
Constructing Dynamic Event Trees from Markov Models (PSAM-0369)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)