Based on operational principle and performance analysis of type III adsorber, a set of test platform for type III adsorber adsorption performance test is designed. After testing of the prototype and analyzing the test data, it is concluded that the prototype is qualified to be used in nuclear power plant and it fills the gap in China.

This content is only available via PDF.
You do not currently have access to this content.