The purpose of the performance test for Unit 1 of Maanshan nuclear power plant is to determine the electrical output and heat rate after the retrofit of the high pressure turbine in the latest refueling outage in 2012. The performance test was conducted in order to verify that the actual improvement in electrical output resulting from the replacement of the high pressure turbine meets the vendor’s guarantee. A total of two performance test runs was conducted in accordance with the ASME performance test code (PTC) 6. The measured electrical powers for the two test runs were 977.4 and 975.0 MWe, respectively, and the average value was 976.2 MWe. After correcting the electrical power to the rated conditions specified in the performance test procedure, the gross electric output was 983.2 MWe. The corrected heat rate for the two performance tests were 10365 and 10353 kJ/kW, respectively. The deviation between the two corrected heat rates was 0.11% and thereby satisfying the test code of 0.25% for the permitted test deviation. Moreover, the performance test results also demonstrated that the improvement in gross electrical output was 17.6 MWe comparing with the pre-retrofit performance test, which exceeded the 10.0 MWe basic performance guarantee by 7.6 MWe.
Skip Nav Destination
2013 21st International Conference on Nuclear Engineering
July 29–August 2, 2013
Chengdu, China
Conference Sponsors:
- Nuclear Engineering Division
ISBN:
978-0-7918-5578-2
PROCEEDINGS PAPER
Performance Tests After High Pressure Turbine Retrofit for Maanshan Nuclear Power Plant Unit 1
Yea-Kuang Chan,
Yea-Kuang Chan
Institute of Nuclear Energy Research, Taoyuan, Taiwan
Search for other works by this author on:
Yu-Ching Tsai,
Yu-Ching Tsai
Institute of Nuclear Energy Research, Taoyuan, Taiwan
Search for other works by this author on:
Chin-Jang Chang,
Chin-Jang Chang
Institute of Nuclear Energy Research, Taoyuan, Taiwan
Search for other works by this author on:
Chun-Chang Lu,
Chun-Chang Lu
Institute of Nuclear Energy Research, Taoyuan, Taiwan
Search for other works by this author on:
Ping-Ling Hsieh
Ping-Ling Hsieh
Taiwan Power Company, Pingtung, Taiwan
Search for other works by this author on:
Yea-Kuang Chan
Institute of Nuclear Energy Research, Taoyuan, Taiwan
Yu-Ching Tsai
Institute of Nuclear Energy Research, Taoyuan, Taiwan
Chin-Jang Chang
Institute of Nuclear Energy Research, Taoyuan, Taiwan
Chun-Chang Lu
Institute of Nuclear Energy Research, Taoyuan, Taiwan
Ping-Ling Hsieh
Taiwan Power Company, Pingtung, Taiwan
Paper No:
ICONE21-16208, V001T01A030; 9 pages
Published Online:
February 7, 2014
Citation
Chan, Y, Tsai, Y, Chang, C, Lu, C, & Hsieh, P. "Performance Tests After High Pressure Turbine Retrofit for Maanshan Nuclear Power Plant Unit 1." Proceedings of the 2013 21st International Conference on Nuclear Engineering. Volume 1: Plant Operations, Maintenance, Engineering, Modifications, Life Cycle and Balance of Plant; Nuclear Fuel and Materials; Radiation Protection and Nuclear Technology Applications. Chengdu, China. July 29–August 2, 2013. V001T01A030. ASME. https://doi.org/10.1115/ICONE21-16208
Download citation file:
10
Views
Related Proceedings Papers
Related Articles
Evaluation of Measurement Uncertainties in Performance Testing of Hydraulic Turbines and Pump/Turbines
J. Eng. Power (April,1975)
Performance of the Integrated Gas and Steam Cycle (IGSC) for Reheat Gas Turbines
J. Eng. Gas Turbines Power (April,1988)
Nuclear Power Plants With Closed-Cycle Helium Turbine for Industrial Energy Supply
J. Eng. Power (January,1971)
Related Chapters
Combined Cycle Power Plant
Energy and Power Generation Handbook: Established and Emerging Technologies
Maine Yankee Atomic Power Plant
Decommissioning Handbook
Performance Testing of Combined Cycle Power Plant
Handbook for Cogeneration and Combined Cycle Power Plants, Second Edition