This paper describes EMC problems and solution in China Nuclear power plant engineering. EMP from switchboard interrupts DCS control system and causes nuclear safety actuation failure when command on commission. Adapting solutions are introduced to improve EMC on site. But the best solution is to archive EMC in factory with a joint test.

This content is only available via PDF.
You do not currently have access to this content.