Nuclear power generation has become an increasingly attractive alternative in the United States (U.S.) power market due to several factors: growing demand for electric power, increasing global competition for fossil fuels, concern over greenhouse gas emissions and their potential impact on climate change, and the desire for energy independence. Assuring the protection of people and the environment are of paramount concern to nuclear power generators and regulators as we move towards a possible nuclear renaissance. Thus, sound engineering design is of utmost important and potential environmental and safety concerns must be carefully evaluated and disposition during permitting of the new nuclear power plants. Areas to be considered in order to alleviate these concerns include the following: • Site meteorology and dispersion conditions of the area; • Evaluation of radiological consequence during normal plant operation and emergency conditions; • Water availability for plant cooling system; • Evaluation of potential land use, water use, ecological and socioeconomic impacts of the proposed action. This paper focuses on site suitability evaluation for greenfield sites through site characterization, examination of challenges/constraints in deployment of available technology/plant systems, and mapping of permitting compliance strategy. Case studies related to selection of plant systems based on the environmental site conditions, preferred compliance plan, and public acceptance, are included.
Skip Nav Destination
18th International Conference on Nuclear Engineering
May 17–21, 2010
Xi’an, China
Conference Sponsors:
- Nuclear Engineering Division
ISBN:
978-0-7918-4934-7
PROCEEDINGS PAPER
Environmental Considerations for Preparing Permit Applications of New Nuclear Power Plants Located in Greenfield Sites Available to Purchase
Ping K. Wan,
Ping K. Wan
Bechtel Power Corporation, Frederick, MD
Search for other works by this author on:
Desmond W. Chan,
Desmond W. Chan
Bechtel Power Corporation, Frederick, MD
Search for other works by this author on:
Alice C. Carson
Alice C. Carson
Bechtel Power Corporation, Frederick, MD
Search for other works by this author on:
Ping K. Wan
Bechtel Power Corporation, Frederick, MD
Desmond W. Chan
Bechtel Power Corporation, Frederick, MD
Alice C. Carson
Bechtel Power Corporation, Frederick, MD
Paper No:
ICONE18-29330, pp. 395-401; 7 pages
Published Online:
April 8, 2011
Citation
Wan, PK, Chan, DW, & Carson, AC. "Environmental Considerations for Preparing Permit Applications of New Nuclear Power Plants Located in Greenfield Sites." Proceedings of the 18th International Conference on Nuclear Engineering. 18th International Conference on Nuclear Engineering: Volume 6. Xi’an, China. May 17–21, 2010. pp. 395-401. ASME. https://doi.org/10.1115/ICONE18-29330
Download citation file:
8
Views
Related Proceedings Papers
Related Articles
Life Cycle Assessment of Hydrogen Production Using Nuclear Energy: An Application Based on Thermochemical Water Splitting
J. Energy Resour. Technol (June,2010)
The Fabulous Nuclear Odyssey of Belgium
J. Pressure Vessel Technol (June,2009)
Design Option of Heat Exchanger for the Next Generation Nuclear Plant
J. Eng. Gas Turbines Power (March,2010)
Related Chapters
External Events PSA for Ringhals 2 PWR (PSAM-0159)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)
Design of Indian Pressurized Heavy Water Reactors
Global Applications of the ASME Boiler & Pressure Vessel Code
Utilities’ Perspective of Spent Fuel Storage
Global Applications of the ASME Boiler & Pressure Vessel Code