A Lungmen RETRAN-3D model has been constructed to predict the transient behaviors for startup test, furthermore verify the acceptance criteria specified in the documents of startup test procedure. This study focuses on the prediction of the startup test with Load Rejection (LR) with bypass and the parametric analysis of lead-lag time constants in pressure regulator. For the analysis of LR with bypass, the major mitigation functions, i.e., Selected Control Rods Run-In (SCRRI) and turbine bypass function, are simulated to examine whether scram is initiated during the transient or not. The analytic results show the reactor is brought to a steady state without scram. The neutron flux in the final state is around 34%, and the pressure regulator sensed maximum pressure rise is limited to a maximum of 3kPa. The result also shows that the 110% steam bypass capacity is capable to mitigate the power increase caused by the positive reactivity insertion as a result of pressure-wave-induced void collapse. For the parametric analysis of lead-lag time constants in pressure regulator, the time domain response of Steam Bypass and Pressure Control System (SBPCS) is demonstrated by a step change of pressure setpoint and different combinations of lead-lag time constants defined in pressure regulator. The results show that the responses, i.e., response time and overshooting, are minimized when the lag time constant is between 4 to 6 seconds and the lead time constant is 50% to 70% of lag time constant. The analysis result of SBPCS provides the trend as a reference for the adjustment of lead-lag time constants during the future Lungmen startup test.
Skip Nav Destination
18th International Conference on Nuclear Engineering
May 17–21, 2010
Xi’an, China
Conference Sponsors:
- Nuclear Engineering Division
ISBN:
978-0-7918-4932-3
PROCEEDINGS PAPER
The Prediction of Startup Test With Load Rejection and Parametric Study of SBPCS for Lungmen Nuclear Power Plant
Chiung-Wen Tsai,
Chiung-Wen Tsai
National Tsing Hua University, Hsinchu, Taiwan
Search for other works by this author on:
Chunkuan Shih,
Chunkuan Shih
National Tsing Hua University, Hsinchu, Taiwan
Search for other works by this author on:
Hao-Tzu Lin,
Hao-Tzu Lin
Institute of Nuclear Energy Research, Longtan, Taoyuan, Taiwan
Search for other works by this author on:
Jong-Rong Wang,
Jong-Rong Wang
Institute of Nuclear Energy Research, Longtan, Taoyuan, Taiwan
Search for other works by this author on:
Yng-Ruey Yuan,
Yng-Ruey Yuan
Institute of Nuclear Energy Research, Longtan, Taoyuan, Taiwan
Search for other works by this author on:
Su-Chin Cheng,
Su-Chin Cheng
Taiwan Power Company, Taipei, Taiwan
Search for other works by this author on:
Fong-Lun Lin
Fong-Lun Lin
Taiwan Power Company, Taipei, Taiwan
Search for other works by this author on:
Chiung-Wen Tsai
National Tsing Hua University, Hsinchu, Taiwan
Chunkuan Shih
National Tsing Hua University, Hsinchu, Taiwan
Hao-Tzu Lin
Institute of Nuclear Energy Research, Longtan, Taoyuan, Taiwan
Jong-Rong Wang
Institute of Nuclear Energy Research, Longtan, Taoyuan, Taiwan
Yng-Ruey Yuan
Institute of Nuclear Energy Research, Longtan, Taoyuan, Taiwan
Su-Chin Cheng
Taiwan Power Company, Taipei, Taiwan
Fong-Lun Lin
Taiwan Power Company, Taipei, Taiwan
Paper No:
ICONE18-29771, pp. 737-742; 6 pages
Published Online:
April 8, 2011
Citation
Tsai, C, Shih, C, Lin, H, Wang, J, Yuan, Y, Cheng, S, & Lin, F. "The Prediction of Startup Test With Load Rejection and Parametric Study of SBPCS for Lungmen Nuclear Power Plant." Proceedings of the 18th International Conference on Nuclear Engineering. 18th International Conference on Nuclear Engineering: Volume 4, Parts A and B. Xi’an, China. May 17–21, 2010. pp. 737-742. ASME. https://doi.org/10.1115/ICONE18-29771
Download citation file:
2
Views
Related Proceedings Papers
Related Articles
Transient Pressure Measurements on a High Head Model Francis Turbine During Emergency Shutdown, Total Load Rejection, and Runaway
J. Fluids Eng (December,2014)
The Application of System CFD to the Design and Optimization of High-Temperature Gas-Cooled Nuclear Power Plants
J. Eng. Gas Turbines Power (May,2008)
A Space–Time-Dependent Study of Control Rods Withdrawal in a Large-Size Pressurized Water Reactor
ASME J of Nuclear Rad Sci (January,2017)
Related Chapters
Part 2, Section II—Materials and Specifications
Companion Guide to the ASME Boiler and Pressure Vessel Code, Volume 1, Third Edition
Part 2, Section II—Materials and Specifications
Companion Guide to the ASME Boiler & Pressure Vessel Code, Volume 1, Second Edition
The NRI Approach for Technical Specifications Evaluation (PSAM-0153)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)