Optimized and improved measures have been implemented in Qinshan III NPP to optimize the management of routine production plan, strengthen maintenance work risk analysis, and improve the plan execution capability, which involve unified management of generation, refuelling, periodic test and maintenance plans, simplifying the defect scales and reducing interlinks of defect disposal, intensifying the assessment on plan execution and adopting performance evaluation and star rating measures.

This content is only available via PDF.
You do not currently have access to this content.