The paper presents benchmarking workload results obtained by a method for operator workload assessment - NASA TLX and a method for human reliability assessment - Performance Evaluation of Teamwork - PET. Based on the archives of nuclear power plant full-scope simulator training in the accident “Main Steam Line Tube Rupture at the WWER-1000 Containment” the capacities of the two methods for indirect and direct or even on-line workload assessment are presented and discussed.
Volume Subject Area:
Safety and Security
This content is only available via PDF.
Copyright © 2009
by ASME
You do not currently have access to this content.