Many nuclear power reactors are increasing their electrical output by increasing their licensed thermal power output. This process requires submitting license change request information to the appropriate regulatory body. One of the fundamental changes to a plant operating condition that must occur to provide additional electrical power generation is an increase in the main steam mass flow. This increase in mass flow results in an increase in the fluid velocity at the main turbine stop and control valves. The increased velocity can be correlated to an increase in the piping support loads as a result of a main turbine trip with a corresponding stop valve closure. The increased loads are a concern for the regulatory body as well as the plant owners since these loads occur at some real frequency in a plant. Typically, an overly conservative scaling factor has been applied to these loads, which may result in unnecessary plant modifications. This paper discusses the fundamental transient fluid dynamic process that results in the main steam piping load. A simplified method is provided that more realistically estimates bounding magnitudes of piping support loads versus percentage power uprate. This method will allow plant design engineers to more realistically determine the increase in the main steam piping support loads that result from power uprate conditions.
Skip Nav Destination
17th International Conference on Nuclear Engineering
July 12–16, 2009
Brussels, Belgium
Conference Sponsors:
- Nuclear Engineering Division
ISBN:
978-0-7918-4352-9
PROCEEDINGS PAPER
Simplified Approach to Establishing Bounding Main Steam Piping Support Load Increase Due to Reactor Power Uprate
Robert Stakenborghs,
Robert Stakenborghs
ILD, Inc., Baton Rouge, LA
Search for other works by this author on:
Lindsey Dziuba
Lindsey Dziuba
ILD, Inc., Baton Rouge, LA
Search for other works by this author on:
Robert Stakenborghs
ILD, Inc., Baton Rouge, LA
Lindsey Dziuba
ILD, Inc., Baton Rouge, LA
Paper No:
ICONE17-75743, pp. 1011-1019; 9 pages
Published Online:
February 25, 2010
Citation
Stakenborghs, R, & Dziuba, L. "Simplified Approach to Establishing Bounding Main Steam Piping Support Load Increase Due to Reactor Power Uprate." Proceedings of the 17th International Conference on Nuclear Engineering. Volume 2: Structural Integrity; Safety and Security; Advanced Applications of Nuclear Technology; Balance of Plant for Nuclear Applications. Brussels, Belgium. July 12–16, 2009. pp. 1011-1019. ASME. https://doi.org/10.1115/ICONE17-75743
Download citation file:
6
Views
Related Proceedings Papers
Related Articles
The Application of System CFD to the Design and Optimization of High-Temperature Gas-Cooled Nuclear Power Plants
J. Eng. Gas Turbines Power (May,2008)
Quick on the Uptake
Mechanical Engineering (December,2002)
Performance Prediction for a Process Heat-and-Power Complex by Resistance Concept
Trans. ASME (April,1958)
Related Chapters
Development of Nuclear Boiler and Pressure Vessels in Taiwan
Companion Guide to the ASME Boiler and Pressure Vessel Code, Volume 3, Third Edition
Lessons Learned: NRC Experience
Continuing and Changing Priorities of the ASME Boiler & Pressure Vessel Codes and Standards
Maine Yankee Atomic Power Plant
Decommissioning Handbook