The Ultimate Heat Sink (UHS) of a nuclear power plant is a complex cooling water system which serves the plant during normal and accident conditions. For some next generation nuclear plants, the UHS sizing is a major design and licensing analysis task. The analysis involves detailed modeling of the transient heat loads and the selection of worst-case meteorological data for the plant site. The UHS sizing requirements for a representative next generation nuclear power plant are evaluated on a month-to-month basis. This paper assesses the UHS water requirement for each month of year. The UHS analysis for a representative next generation nuclear plant with mechanical draft cooling towers and a water basin is used to determine the maximum evaporation of the basin for the worst-case meteorological data on a month-to-month basis. To size the cooling tower basin, automated methods have been developed which determine the highest evaporative losses from the basin and highest basin temperature over a 30-day design basis accident period. This paper also evaluates the month-to-month basin temperature changes. This assessment is done for a representative next generation nuclear power plant and considers the monthly historical meteorological data over 45 years. The result of this assessment of monthly UHS water requirement is of interest in assessing the margin in the UHS design. This monthly assessment is also useful in demonstrating that the automated methods used to establish the limiting 30-day meteorological condition are indeed accurate. In addition, these results may be useful in helping to plan plant maintenance activities.
Skip Nav Destination
17th International Conference on Nuclear Engineering
July 12–16, 2009
Brussels, Belgium
Conference Sponsors:
- Nuclear Engineering Division
ISBN:
978-0-7918-4351-2
PROCEEDINGS PAPER
Ultimate Heat Sink Sizing Requirements on a Month-to-Month Basis
Dong Zheng,
Dong Zheng
Bechtel Power Corporation, Frederick, MD
Search for other works by this author on:
Allen T. Vieira,
Allen T. Vieira
Bechtel Power Corporation, Frederick, MD
Search for other works by this author on:
Julie M. Jarvis,
Julie M. Jarvis
Bechtel Power Corporation, Frederick, MD
Search for other works by this author on:
George P. Emsurak
George P. Emsurak
Pennsylvania State University, University Park, PA
Search for other works by this author on:
Dong Zheng
Bechtel Power Corporation, Frederick, MD
Allen T. Vieira
Bechtel Power Corporation, Frederick, MD
Julie M. Jarvis
Bechtel Power Corporation, Frederick, MD
George P. Emsurak
Pennsylvania State University, University Park, PA
Paper No:
ICONE17-75714, pp. 919-924; 6 pages
Published Online:
February 25, 2010
Citation
Zheng, D, Vieira, AT, Jarvis, JM, & Emsurak, GP. "Ultimate Heat Sink Sizing Requirements on a Month-to-Month Basis." Proceedings of the 17th International Conference on Nuclear Engineering. Volume 1: Plant Operations, Maintenance, Engineering, Modifications and Life Cycle; Component Reliability and Materials Issues; Next Generation Systems. Brussels, Belgium. July 12–16, 2009. pp. 919-924. ASME. https://doi.org/10.1115/ICONE17-75714
Download citation file:
8
Views
Related Proceedings Papers
Related Articles
Characterization of Atmospheric Radiological Dispersion Alongside Risky Location Designation and Shelter House Proposition Around the Planned Rooppur Nuclear Power Plant
ASME J of Nuclear Rad Sci (October,2020)
Ten Years of Meteorological Measurements for Offshore Wind Farms
J. Sol. Energy Eng (May,2005)
The Pluviophone: Measuring Rainfall by Its Sound
J. Vib. Acoust (June,2015)
Related Chapters
Meteorological Data Processing
Air Quality Meteorology and Atmospheric Ozone
The Application of GPS in Meteorology
International Conference on Electronics, Information and Communication Engineering (EICE 2012)
Modeling of the Processes in the Airport Area (PSAM-0468)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)