A common challenge to operators of plants nearing the end of design life or undergoing life extension is to maintain safe and economic operation where multiple components are degrading simultaneously due to ageing effects. Typically, the management of ageing is carried out on a component-by-component basis but the real challenge is to ensure that the collective impacts of degradation are controlled such that the risk posed by continued operation of the plant remains acceptably small. The strategy being proposed to the Canadian industry is to use a risk-informed approach that derives failure frequency targets for individual components in a manner that ensures that the total risk remains within established limits. These frequency limits can then be embodied in fitness for service guidance to manage component reliability. The approach is to use the component importance measures in the plant PSA to derive the failure frequency that would result in a risk contribution of 1E−06 or less per reactor-year to the severe core damage frequency. Given that the safety goal limit for existing plants is 1E−04 per reactor-year, this would allow a number of components to be managed in this way without a significant increase in severe core damage frequency relative to the limit, where a cumulative increase of 1E−05 per reactor-year or more would be considered “significant”. A limit is placed on the derived “allowable” failure frequency for any individual component by deterministic considerations, in that the frequency is not permitted to exceed the maximum for the event class for which it was licensed in Canada. The frequency is also reviewed for economic and operability implications to ensure such risks are not unreasonably high. This approach helps to achieve a balanced allocation of inspection and maintenance resources as well as maintaining an adequate safety margin. The paper summarizes some of the challenges facing the current CANDU fleet, and provides examples of how the proposed approach could be applied to selected components. It should be noted that the approach is under consideration by the Canadian industry but is not committed at the present time.
Skip Nav Destination
17th International Conference on Nuclear Engineering
July 12–16, 2009
Brussels, Belgium
Conference Sponsors:
- Nuclear Engineering Division
ISBN:
978-0-7918-4351-2
PROCEEDINGS PAPER
Managing CANDU Plant Ageing Using a Risk Informed Engineering Approach
Keith S. Dinnie
Keith S. Dinnie
AMEC NSS, Toronto, ON, Canada
Search for other works by this author on:
Keith S. Dinnie
AMEC NSS, Toronto, ON, Canada
Paper No:
ICONE17-75331, pp. 53-59; 7 pages
Published Online:
February 25, 2010
Citation
Dinnie, KS. "Managing CANDU Plant Ageing Using a Risk Informed Engineering Approach." Proceedings of the 17th International Conference on Nuclear Engineering. Volume 1: Plant Operations, Maintenance, Engineering, Modifications and Life Cycle; Component Reliability and Materials Issues; Next Generation Systems. Brussels, Belgium. July 12–16, 2009. pp. 53-59. ASME. https://doi.org/10.1115/ICONE17-75331
Download citation file:
7
Views
Related Proceedings Papers
Related Articles
Facility Integrity Management and Assessment of Associated Risk Conditions
J. Pressure Vessel Technol (August,2016)
Risk-Based Maintenance Planning for Deteriorating Pressure Vessels With Multiple Defects
J. Pressure Vessel Technol (August,2017)
The Use of Risk-Based Approaches in Post-Construction Standards
J. Pressure Vessel Technol (August,2000)
Related Chapters
Use of PSA in Lisencing of EPR 1600 in Finland (PSAM-0160)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)
Digital Transformation by the Implementation of the True Digital Twin Concept and Big Data Technology for Structural Integrity Management
Ageing and Life Extension of Offshore Facilities
Inspection-Based Life Extension of Offshore Jacket Fleets
Ageing and Life Extension of Offshore Facilities