Electricity is the engine for the growth of economy of any country. Total installed electricity generation capacity of Pakistan is presently approx 20,000 MW as given in Table-1. Despite this, almost 40% of the population is without electricity. Pakistan has been blessed with tremendous resources for electrical power generation with hydel, coal, renewable energy resources and Nuclear power. Hydel, coal potential of more than 40,000 MW and 10,000 MW are available but only 15% of hydroelectric potential has been harnessed so for where as only 150 MW power plant on indigenous coal has been set up. To exploit Pakistan hydel and coal resources for power generation large investments are needed which Pakistan economy can not afford. Govt. of Pakistan has created an organization of private power and infrastructure board (PPIB) to facilitate private sector in the participation of power generator. PPIB is tapping the resources and facilitating the private sector for establishment of power projects. Pakistan is collaborating with China for establishment of Nuclear Power Plants and plan to generate up to 10,000 MW by year 2025. Renewable energy resources are also required to be tapped. This paper will focus on the Pakistan power generation potential by utilizing local resources keeping in view the next 20 year supply and demand position.
Skip Nav Destination
16th International Conference on Nuclear Engineering
May 11–15, 2008
Orlando, Florida, USA
Conference Sponsors:
- Nuclear Engineering Division
ISBN:
0-7918-4817-5
PROCEEDINGS PAPER
Solution to Pakistan Electrical Power Crisis
Sajjad Akbar,
Sajjad Akbar
Riphah International University, Islamabad, Pakistan
Search for other works by this author on:
Shahab Khusnood
Shahab Khusnood
University of Engineering and Technology, Taxila, Pakistan
Search for other works by this author on:
Sajjad Akbar
Riphah International University, Islamabad, Pakistan
Shahab Khusnood
University of Engineering and Technology, Taxila, Pakistan
Paper No:
ICONE16-48207, pp. 877-883; 7 pages
Published Online:
June 24, 2009
Citation
Akbar, S, & Khusnood, S. "Solution to Pakistan Electrical Power Crisis." Proceedings of the 16th International Conference on Nuclear Engineering. Volume 4: Structural Integrity; Next Generation Systems; Safety and Security; Low Level Waste Management and Decommissioning; Near Term Deployment: Plant Designs, Licensing, Construction, Workforce and Public Acceptance. Orlando, Florida, USA. May 11–15, 2008. pp. 877-883. ASME. https://doi.org/10.1115/ICONE16-48207
Download citation file:
4
Views
Related Proceedings Papers
Related Articles
Optimizing Selection of Appropriate Power Generation Systems in Indonesia By Using Distance Based Approach Method
J. Energy Resour. Technol (March,2004)
Power to the People
Mechanical Engineering (September,2000)
Current Status and Future Developments in Nuclear-Power Industry of the World
ASME J of Nuclear Rad Sci (April,2019)
Related Chapters
Development of Nuclear Boiler and Pressure Vessels in Taiwan
Global Applications of the ASME Boiler & Pressure Vessel Code
Maine Yankee Atomic Power Plant
Decommissioning Handbook
Preserving Nuclear Power's Place in a Balanced Power Generation Policy
Energy and Power Generation Handbook: Established and Emerging Technologies