Hitachi has so far developed the construction management system with information technology since more than twenty years ago. As the recent results, we developed the advanced new functions and applied them to the Nuclear Power Plant (NPP)’s under construction. RFID-applied construction management method with personal digital assistant (PDA) could realize more reliable and efficient construction control on a site. By enhancing an Integrated Schedule Planning function, the construction scheme could be more accurately and speedily developed, which made it possible to realize the standardization of schedule planning, the linkage with other systems, and the improvement of operability. By applying these new technologies to Hitachi construction management, Hitachi can supply the nuclear power plant with higher quality, safety, and reliability.
Skip Nav Destination
16th International Conference on Nuclear Engineering
May 11–15, 2008
Orlando, Florida, USA
Conference Sponsors:
- Nuclear Engineering Division
ISBN:
0-7918-4817-5
PROCEEDINGS PAPER
Hitachi-GE Advanced Construction Management Technologies
Kimiharu Onda,
Kimiharu Onda
Hitachi-GE Nuclear Energy, Ltd., Hitachi, Ibaraki, Japan
Search for other works by this author on:
Masatoshi Takada,
Masatoshi Takada
Hitachi-GE Nuclear Energy, Ltd., Hitachi, Ibaraki, Japan
Search for other works by this author on:
Hisako Okada,
Hisako Okada
Hitachi-GE Nuclear Energy, Ltd., Hitachi, Ibaraki, Japan
Search for other works by this author on:
Kazuto Tatehora
Kazuto Tatehora
Hitachi-GE Nuclear Energy, Ltd., Hitachi, Ibaraki, Japan
Search for other works by this author on:
Kimiharu Onda
Hitachi-GE Nuclear Energy, Ltd., Hitachi, Ibaraki, Japan
Masatoshi Takada
Hitachi-GE Nuclear Energy, Ltd., Hitachi, Ibaraki, Japan
Hisako Okada
Hitachi-GE Nuclear Energy, Ltd., Hitachi, Ibaraki, Japan
Kazuto Tatehora
Hitachi-GE Nuclear Energy, Ltd., Hitachi, Ibaraki, Japan
Paper No:
ICONE16-48826, pp. 453-460; 8 pages
Published Online:
June 24, 2009
Citation
Onda, K, Takada, M, Okada, H, & Tatehora, K. "Hitachi-GE Advanced Construction Management Technologies." Proceedings of the 16th International Conference on Nuclear Engineering. Volume 4: Structural Integrity; Next Generation Systems; Safety and Security; Low Level Waste Management and Decommissioning; Near Term Deployment: Plant Designs, Licensing, Construction, Workforce and Public Acceptance. Orlando, Florida, USA. May 11–15, 2008. pp. 453-460. ASME. https://doi.org/10.1115/ICONE16-48826
Download citation file:
7
Views
Related Proceedings Papers
Related Articles
Homogenization of Quasi-Periodic Structures
J. Vib. Acoust (August,2006)
Developing Innovative Deep Water Pipeline Construction Techniques with Physical Models
J. Offshore Mech. Arct. Eng (February,2007)
Technical Evaluation Method of Mechanical Equipment Item Substitution in the Procurement and Construction Process of Nuclear Power Plant
ASME J of Nuclear Rad Sci (January,2023)
Related Chapters
Selection of the Order of the Construction of Structures of a Multiple-Structure Project, Taking Into Account Time-Cost Optimisation
International Conference on Control Engineering and Mechanical Design (CEMD 2017)
Subsection NCA—General Requirements for Division 1 and Division 2
Companion Guide to the ASME Boiler and Pressure Vessel Codes, Volume 1, Fifth Edition
Introduction to Power Boilers
Companion Guide to the ASME Boiler and Pressure Vessel Codes, Volume 1, Fifth Edition