The postulated total station blackout accident (SBO) of PWR NPP with 600 MWe in China is analyzed as the base case using SCDAP/RELAP5 code. Then the hot leg or surge line are assumed to rupture before the lower head of Reactor Pressure Vessel (RPV) ruptures, and the progressions are analyzed in detail comparing with the base case. The results show that the accidental rupture of hot leg or surge line will greatly influence the progression of accident. The probability of hot leg or surge line rupture in intentional depressurization is also studied in this paper, which provides a suggestion to the development of Severe Accident Management Guidelines (SAMG).