The goal of this work is the investigation of the influence of different accident management strategies on the thermal-hydraulics in the containment during a Large Break Loss of Coolant Accident with a large containment leak from the beginning of the accident. The increasing relevance of terrorism suggests a closer look at this kind of severe accidents. Normally the course of severe accidents and their associated phenomena are investigated with the assumption of an intact containment from the beginning of the accident. This intact containment has the ability to retain a large part of the radioactive inventory. In these cases there is only a release via a very small leakage due to the untightness of the containment up to cavity bottom melt through. This paper represents the last part of a comprehensive study on the influence of accident management strategies on the source term of VVER-1000 reactors. Basically two different accident sequences were investigated: the “Station Blackout”-sequence and the “Large Break LOCA”. In a first step the source term calculations were performed assuming an intact containment from the beginning of the accident and no accident management action. In a further step the influence of different accident management strategies was studied. The last part of the project was a repetition of the calculations with the assumption of a damaged containment from the beginning of the accident. This paper concentrates on the last step in the case of a Large Break LOCA. To be able to compare the results with calculations performed years ago the calculations were performed using the Source Term Code Package (STCP), hydrogen explosions are not considered. In this study four different scenarios have been investigated. The main parameter was the switch on time of the spray systems. One of the results is the influence of different accident management strategies on the source term. In the comparison with the sequence with intact containment it was demonstrated that the accident management measures have quite lower consequences. In addition it was shown that in the case of a “Large Break LOCA”-sequence the intact containment retains the nuclides up to a factor of 20 000. This is much more than in the case of a “Station Blackout”-sequence. Within the frame of the study 17 source terms have been generated to evaluate in detail accident management strategies for VVER-1000 reactors.
Skip Nav Destination
14th International Conference on Nuclear Engineering
July 17–20, 2006
Miami, Florida, USA
Conference Sponsors:
- Nuclear Engineering Division
ISBN:
0-7918-4243-6
PROCEEDINGS PAPER
Large Break LOCA Accident Management Strategies for Accidents With Large Containment Leaks
Gert Sdouz
Gert Sdouz
ARC Seibersdorf Research GmbH, Seibersdorf, Austria
Search for other works by this author on:
Gert Sdouz
ARC Seibersdorf Research GmbH, Seibersdorf, Austria
Paper No:
ICONE14-89861, pp. 873-879; 7 pages
Published Online:
September 17, 2008
Citation
Sdouz, G. "Large Break LOCA Accident Management Strategies for Accidents With Large Containment Leaks." Proceedings of the 14th International Conference on Nuclear Engineering. Volume 2: Thermal Hydraulics. Miami, Florida, USA. July 17–20, 2006. pp. 873-879. ASME. https://doi.org/10.1115/ICONE14-89861
Download citation file:
4
Views
Related Proceedings Papers
Related Articles
Analyses of Feedwater Trip With SBO Sequence of VVER1000 Reactor
ASME J of Nuclear Rad Sci (October,2016)
Combining RAVEN, RELAP5-3D, and PHISICS for Fuel Cycle and Core Design Analysis for New Cladding Criteria
ASME J of Nuclear Rad Sci (April,2017)
Methodology for Calculating Minor Radioactive Releases From VVER 1000 Using TRACE Code
ASME J of Nuclear Rad Sci (April,2021)
Related Chapters
PSA Level 2 — NPP Ringhals 2 (PSAM-0156)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)
Insights and Results of the Shutdown PSA for a German SWR 69 Type Reactor (PSAM-0028)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)
Modeling of SAMG Operator Actions in Level 2 PSA (PSAM-0164)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)