Significant differences have been identified in loss of offsite power (LOSP or LOOP) event description, category, duration, and applicability between the LOSP events used in NUREG/CR-6890 and ENS’ LOSP packages, which were based on EPRI LOSP reports with plant-specific applicability analysis. Thus it is appropriate to reconcile the LOSP data listed in the subject NUREG and EPRI reports. A cross comparison showed that 62 LOSP events in NUREG/CR-6890 were not included in the EPRI reports while 4 events in EPRI reports were missing in the NUREG. Among the 62 events missing in EPRI reports, the majority were applicable to shutdown conditions, which could be classified as category IV events in EPRI reports if included. Detailed reviews of LERs concluded that some events did not result in total loss of offsite power. Some LOSP events were caused by subsequent component failures after a turbine/plant trip, which have been modeled specifically in most ENS plant PRA models. Moreover, ENS has modeled (or is going to model) the partial loss of offsite power events with partial LOSP initiating events. While the direct use of NUREG/CR-6890 results in SPAR models may be appropriate, its direct use in ENS’ plant PRA models may not be appropriate because of modeling details in ENS’ plant-specific PRA models. Therefore, this paper lists all the differences between the data in NUREG/CR-6890 and EPRI reports and evaluates the applicability of the LOSP events to ENS plant-specific PRA models. The refined LOSP data will characterize the LOSP risk in a more realistic fashion.
Skip Nav Destination
14th International Conference on Nuclear Engineering
July 17–20, 2006
Miami, Florida, USA
Conference Sponsors:
- Nuclear Engineering Division
ISBN:
0-7918-4242-8
PROCEEDINGS PAPER
Applicability of Loss of Offsite Power (LOSP) Events in NUREG/CR-6890 for Entergy Nuclear South (ENS) Plants’ LOSP Calculations
Fatma Yilmaz,
Fatma Yilmaz
Entergy Nuclear South, Jackson, MS
Search for other works by this author on:
Loys Bedell
Loys Bedell
Entergy Nuclear South, Jackson, MS
Search for other works by this author on:
Yunlong Li
Entergy Nuclear South, Jackson, MS
Fatma Yilmaz
Entergy Nuclear South, Jackson, MS
Loys Bedell
Entergy Nuclear South, Jackson, MS
Paper No:
ICONE14-89644, pp. 239-248; 10 pages
Published Online:
September 17, 2008
Citation
Li, Y, Yilmaz, F, & Bedell, L. "Applicability of Loss of Offsite Power (LOSP) Events in NUREG/CR-6890 for Entergy Nuclear South (ENS) Plants’ LOSP Calculations." Proceedings of the 14th International Conference on Nuclear Engineering. Volume 1: Plant Operations, Maintenance and Life Cycle; Component Reliability and Materials Issues; Codes, Standards, Licensing and Regulatory Issues; Fuel Cycle and High Level Waste Management. Miami, Florida, USA. July 17–20, 2006. pp. 239-248. ASME. https://doi.org/10.1115/ICONE14-89644
Download citation file:
9
Views
Related Proceedings Papers
Related Articles
Effect of Condition Monitoring on Risk Mitigation for Steam Turbines in the Forest Products Industry
ASME J. Risk Uncertainty Part B (September,2017)
Modeling the Gas Turbine Engine Under Its Dynamic Heating Conditions
J. Eng. Gas Turbines Power (March,2015)
System-Level Performance of Microturbines With an Inside-Out Ceramic Turbine
J. Eng. Gas Turbines Power (June,2017)
Related Chapters
USE OF A GEOHAZARD MANAGEMENT PROGRAM TO REDUCE PIPELINE FAILURE RATES
Pipeline Integrity Management Under Geohazard Conditions (PIMG)
PSA Level 2 — NPP Ringhals 2 (PSAM-0156)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)
Impact of CCF Assumptions on PSA and PSA Application Calculations (PSAM-0172)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)